SystemESG & Sustainability Reporting

ESG Data Assurance Readiness

ISSA 5000 readiness, figure by figure, with every number an assurer will test traced and fixed before fieldwork

See one case, screen by screen ↓
Watch with transcript →

Built forESG controllersSustainability data ownersInternal audit leadsExternal assurers

The Problem Today

Groups check their figures only back to the workbook, so the assurer is first to find weak sources and unsigned reviews.

41 days
of work to prepare one year's statement for the assurer our estimate
75%
of large companies obtained assurance on some ESG data in 2024 published

What the assurer will test

  • Calculation
  • Source
  • Control
  • Evidence
  • Estimates never replacedA December estimate stays in after the invoice arrives
  • Evidence chased by emailEach assurer request answered one by one

The Solution

  1. Each figure tracedFrom the page to the source system, the control and the evidence
  2. A sample re-performedRisk-weighted items re-checked against invoices, as an assurer would
  3. Likely findings draftedControls inspected, and each finding comes with its basis and a fix
  4. Two people sign readinessThe ESG controller and internal audit sign, each exception explained

Built-in controls

  • Agents do not change a reported figure
  • The assurer sees only what you release
  • A person decides each likely finding

What You Get

Fewer findings arrive in fieldwork, so fewer tables are restated in the weeks before publication.

7.5 days
of preparation for the assurer, down from 41 our estimate
  • Misstatements caught firstAn understated figure found while there is time to fix it
  • Readiness you can trackOne score, with each change explained and each fix's effect shown
  • Requests answered with evidenceEach assurer request gets a pack of cited documents
In short

What is ESG Data Assurance Readiness?

ESG Data Assurance Readiness traces each reported ESG figure to its source evidence and controls, ready for ISSA 5000 assurance. Seven agents trace each figure through five layers, test controls and re-check samples. They also collect evidence and write the findings an assurer would likely raise. The ESG controller decides each finding and approves verified fixes. Before fieldwork, the controller signs readiness with internal audit.

How to choose AI solutions for back-office and enterprise work →

Updated

The problem

Groups don't see their weak figures until the assurer finds them, weeks before publication

Large companies publish a sustainability statement each year, and most have an outside assurer check some of it. The rules for that check are getting stricter. ISSA 5000 is the new standard for assuring sustainability reports. For periods beginning on or after 15 December 2026, its assurers look past the printed total. They test the reporting process, the systems and the controls behind each figure. They ask how a number was calculated, which system it came from, which control checked it and what evidence proves it.

Most groups are not set up to answer those questions. They still prepare with spreadsheets and email. The final check a week before publication follows each figure back to the workbook, and stops there. So nobody looks at the weak spots behind it. A December estimate was never replaced by the invoice. A monthly review was done, but the reviewer never signed it. Evidence is chased request by request across sites and owners. The assurer finds these problems in fieldwork, when it tests the figures, just weeks before publication. By then, fixing a figure means restating a table under deadline. A control without a signature cannot be relied on for the quarter.

typical75%of large companies already obtain assurance on some sustainability disclosures (IFAC, 2024 data)
typical15 Dec 2026ISSA 5000 applies to periods beginning on or after this date (IAASB)
Where the weeks before fieldwork go, in working daysestimated
By hand41 days
With the solution7.5 days
  • Tying each figure past the workbook to the system and the invoice10 → 1 d
  • Walking through controls and looking for reviewer sign-offs6 → 1 d
  • Picking samples and re-performing them against source documents5 → 0.5 d
  • Requesting, chasing and checking evidence from data owners12 → 3 d
  • Correcting figures after the assurer's findings8 → 2 d

Estimated split for preparing one year's sustainability statement for limited assurance, by hand and with the solution.

How it works

Five layers per figure, statement to evidence, for ISSA 5000

What comes in
Sources in6 systems · statement, energy, ERP, HR, EHS, evidence library
Agents at work
Tracerfive layers
Then
Samplerre-performs
Control testerinspects instances
Then
Mock assurerlikely findings
Evidence collectorexact document
Then
Readiness scorermoves with each fix
Assurer liaisonreleased packs
A person decides
ESG Controllerdecides, signs with Internal Audit
What comes out
Traced figure
Signed readiness
Released evidence
One case, step by step

Scope 2 location-based, weak at the source, fixed before fieldwork

The group's sustainability statement for the year is in draft. In 21 days the assurer starts fieldwork for limited assurance, the lighter of the two assurance levels. As agreed in the engagement letter, it will apply ISSA 5000 early. Here is one working day, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01Morning

    The agents worked overnight, and the controller reads what they found

    ESG controller

    Readiness is 87%, up 3 points in a week against a target of 95%. Of 146 figures, 127 are ready, 14 are weak and 5 have gaps. Overnight, the Tracer re-traced 41 figures on 6 statement pages, and one changed. Scope 2 location-based counts the emissions from bought electricity, using average grid factors. That figure, 48,210 tCO2e, is now weak at the source. Five items need the controller, from two new likely findings to an expired HR system connection.

    “Next: Scope 2 location-based is weak at the source. The agents traced it, re-checked 25 site-months and drafted two fixes.”

  2. 02One click

    The statement page, with the figure's X-ray beside it

    ESG controller

    The controller works from page 41 as it will be published. The page is E1-6, gross Scopes 1, 2, 3 and total GHG emissions, and each figure is marked Ready, Weak or Gap. Clicking 48,210 opens its five layers. The figure ties out, and the Scope 2 workbook re-computes. But the source system is the first weak layer. Of 744 site-months, 741 come from invoices or meter reads. Three December values are estimates whose invoices arrived after the data cut-off.

    Tracer · confidence 96%. Read-only on each system, it does not change a reported figure.

  3. 03A plain question

    Which sites are estimated, answered with the sources

    ESG controller and the Tracer

    The controller asks under the figure, in plain words. The Tracer answers with the three sites and their numbers. A plant was estimated at 1,840 MWh, against an invoice of 2,112. A distribution center was at 1,210 against 1,166, and a service center at 960 against 1,128. Each value carries a numbered citation that opens the passage it was read from. Above the answer, two fixes from the Mock assurer wait for a decision.

    “All three invoices arrived after the data cut-off.”

  4. 04Overnight

    The overnight run, step by step

    The agents

    The run took 14 minutes. Each agent shows its plan, what it read, how sure it is and who it handed to. The Tracer read the statement, the workbook, the grid factor set and the three sites' energy records in 2 min 40 s. Then it handed the control and evidence layers to the Sampler and the Control tester.

    “Agents read only; people decide.”

  5. 05During the run

    25 site-months re-performed against supplier invoices

    Sampler

    The population is 744 site-months and 117,450 MWh. From it, the Sampler picked 22 items at random, weighted by MWh, and added the 3 estimates as targeted items. That matches the sample size the assurer used last year. The 22 agree within 1%. The 3 targeted items differ by +272, −44 and +168 MWh. Together that is +396 MWh, or +223 tCO2e, 0.46% of the figure.

    It reports each difference, however small, and does not replace the assurer's own sampling.

  6. 06During the run

    The monthly review is designed well, but December is unsigned

    Control tester

    The control says the regional reviewer signs each monthly meter and invoice review within 10 working days. The Control tester followed one site through the whole review. Then it inspected each instance in Q4. October and November are signed by the reviewer. In December the 62 site reviews were done, but no reviewer sign-off is recorded. So the design is effective, but the control did not work as designed in December.

    Control tester · confidence 94%. It proposes the conclusion, and Internal Audit confirms it.

  7. 07End of the run

    The findings an ISSA 5000 assurer would likely raise

    Mock assurer

    The first finding is a misstatement. December estimates at 3 sites were not replaced by invoices, a difference of +223 tCO2e. That is below performance materiality of 5%, the error threshold for each figure, but the assurer will test the step. The second is a control deficiency, because the monthly review has no reviewer sign-off for December. Each finding carries its basis, the figures it touches, its confidence and the likely outcome. The controller can accept, edit or dismiss each one with a reason.

    On the misstatement: “Likely raised as a misstatement the assurer asks you to correct; not a modified conclusion.”

  8. 08Mid-morning

    Both findings accepted, and two fixes assigned

    ESG controller

    One fix is to replace the December estimates with invoices at the three sites. It goes to the sustainability data owner with a due date. The other is to record the December reviewer sign-off with evidence, and it goes to the regional reviewer. Before confirming, the controller sees what the fixes are worth: 6 figures ready, and readiness up from 87% to 91%. The Evidence collector notifies both owners.

    “The agents re-run the trace and the sample when each owner marks the fix done.”

  9. 09Nothing unseen

    Evidence goes to the assurer only once it is released

    ESG controller and the Assurer liaison

    In the assurer room, the Assurer liaison has built a pack for each of the assurer's 18 requests. Twelve are released, and one is waiting on the two fixes. The controller previews the request for water withdrawal by site, with meter evidence. It holds five documents, each read from its source and fingerprinted. The controller releases it to the assurer, read-only.

    “Read-only for the assurer · each view is logged.”

  10. 10Before fieldwork

    Two people sign readiness, with each exception on record

    ESG controller and internal audit lead

    The Readiness scorer checks the conditions. Each likely finding must be accepted or dismissed, and each figure in scope traced through five layers. Readiness must be at 95%, or each remaining exception needs a reason code. Nineteen figures are not yet ready, each with its finding and a fix due before fieldwork. Once each has a reason code, the ESG controller and the internal audit lead sign.

    Signature meaning: “Ready for limited assurance fieldwork, exceptions recorded.”

Who it’s for

ISSA 5000 readiness for the controller, data owners, audit and the assurer

Four people work on the same statement on the way into fieldwork. Here are their weeks before, by hand, then with the agents.

ESG controller
Decides, releases and signs
Before
Owns the statement's controls and the relationship with the assurer. Hears about the weak figures in fieldwork, two weeks before publication.
Now
Sees the likely findings before the assurer does. Opens each weak figure's layers, decides the findings, assigns fixes and approves them once the agents verify.
Sustainability data owner
Owns energy and emissions data for 62 sites
Before
Loads site energy data in January, with December often estimated. Then answers evidence requests by email, one back-and-forth at a time.
Now
Gets requests that name the exact document, site, period and due date, and a wrong file comes back with the reason.
Internal audit lead
Confirms control conclusions, co-signs
Before
Is asked to give comfort on sustainability controls before fieldwork. The evidence of each review sits in an email or a ticked spreadsheet.
Now
Treats a control without a reviewer's signature as a control that did not run. Sees each control tested on its real instances, confirms the conclusion and adds the second signature.
External assurer
Engagement manager, read-only
Before
Plans fieldwork from a list of requests, then waits days for each document and finds the gaps alone.
Now
Follows the path from a reported figure to its invoices in the released packs, each document cited to its source. Asks questions in one thread.
The agents

Tracer, sampler, control tester and mock assurer for assurance readiness

Working like an assurer who arrives early, the agents trace, sample, test controls and write the likely findings. They check each other's work. The ESG Controller decides and signs with Internal Audit.

Tracer

Builds the path of each reported figure: statement, calculation, source system, control and evidence. It re-computes the workbook from its inputs and reads each input in its system of record. It marks the first weak layer, with a confidence and the source passage for each.

  • Read-only on every system of record, and never changes a reported figure
  • Every link cites its source passage
  • Below 80% confidence, a person reviews
Control tester

Tests a control's design by walking through it, and checks that it worked by inspecting real instances. This is how an ISSA 5000 assurer would test it.

  • Never concludes a control is effective without the reviewer's evidence
  • Internal Audit confirms every conclusion
Sampler

Picks a risk-weighted sample from each figure's population and re-checks every item against its source document.

  • Reports every difference, however small
  • Never replaces the assurer's own sampling
Evidence collector

Asks each owner for the exact document, sends reminders, and checks that what comes back is for the right site, period and amount.

  • Never accepts a document for the wrong period or site
  • Reminders go out only after a person presses Send
Mock assurer

Writes the findings an ISSA 5000 assurer would probably raise. Each has its basis, the evidence, the effect against materiality, the likely outcome and a drafted fix.

  • Never contacts the real assurer
  • States its confidence, and below 80% a person reviews
  • The ESG Controller accepts or dismisses every finding
Readiness scorer

Computes readiness and explains every change in it. Shows the effect of each fix before anyone accepts it, and checks the sign-off conditions.

  • A figure is ready only when all five layers are strong and no finding is open
Assurer liaison

Assembles an evidence pack for each of the assurer's requests from cited sources, and drafts answers to the assurer's questions from the record.

  • Shares nothing until the ESG Controller releases it
  • The assurer's access is read-only
ESG Controller and Internal Audit

Decide and sign.

Ask in plain words

Questions on a weak figure, a control test or an assurer's request

Ask in plain words on any screen. The agents answer with citations to the passage they read, and act on what you ask. Nothing is sent without you. These answers use the sample data.

Why is Scope 2 location-based weak?

The figure itself ties out. The 48,210 tCO2e on page 41 matches the workbook. The weakness is the source. Three sites kept a December estimate after the invoices arrived, and the invoices show 396 MWh more. That is +223 tCO2e (0.46%). December's monthly review also has no reviewer sign-off.

What would the assurer find if fieldwork started today?

The Mock assurer expects 10 findings: 3 misstatements, 3 control deficiencies, 2 evidence gaps and 2 method points. None is above performance materiality of 5% per metric. The largest is 4,500 tCO2e of credits with no retirement record. The unapproved category 11 method is the one most likely to change the wording of the conclusion.

Remind each owner with an overdue evidence request

Two requests are overdue: contractor hours (3 days) and an HR export (2 days). I selected both and drafted the reminders. Press Send to send them. Nothing goes out without you.

Draft our answer to the assurer's question on December estimates

The assurer asked how December estimates are replaced by actuals and who checks it. The close calendar says estimates are replaced before the statement is final, but three were not. I drafted a plain answer that says so, names the two fixes, and promises the request's pack with all 25 sampled invoices. It is in the assurer room for you to edit and send.

The screens

The statement X-ray, the likely findings and the assurer room

From the working solution, on its sample data. Pick one to see it large.

TodayReadiness for assurance, what the agents found overnight in their own words, and the five things that need the ESG controller.
Statement X-rayThe statement page as it will be published, each figure marked Ready, Weak or Gap. Beside it are the five layers of the selected figure, with the first weak layer open.
Ask about a figureThe agents' conversation on one figure: what each found, the two fixes proposed for a decision, and a cited answer to a plain question.
Agent runsEach run step by step: each agent's plan, the sources it read, its confidence, its result and who it handed to.
SamplesThe population, the method and the 25 items re-performed against supplier invoices, filtered to the three that differ.
Control testWhat the control says, how it was tested (walkthrough, instances, cross-check) and the conclusion for Internal Audit to confirm.
Likely findingsWhat an ISSA 5000 assurer would probably raise, with type, effect against materiality, confidence and likely outcome, each to accept, edit or dismiss.
Accept and assignTwo fixes with owner and due date, and the readiness they will move before anyone confirms.
Fixes before fieldworkEach fix with the figures it makes ready. Fixes the agents verified wait for approval, and the overdue one is flagged.
Evidence requestsRequests with their due dates, and a returned document the Evidence collector caught as the wrong quarter, ready to go back with a reason.
Assurer roomThe assurer's requests and the evidence pack for each, each document cited and fingerprinted, released read-only.
Readiness sign-offThe conditions checked, the remaining exceptions each needing a reason code, and two signatures: ESG controller and internal audit.
Audit trailEach action by people and agents in order, with what it touched. It cannot be edited and exports for the assurer.
Governance

Read-only agents, a person on each finding and two signatures

Each value cites its sourceEach layer, agent statement and finding links to the passage it came from, with who read it and when. That might be the statement page, the workbook cell, the system record, the invoice or the sign-off log.
Read-only on each systemThe agents have read-only access to the ERP, HR, energy, EHS, registry and evidence systems. They do not change a reported figure. They propose, and people decide.
A person decides each findingThe ESG controller accepts, edits or dismisses each likely finding with a reason code. A fix is approved only after the agents have re-run the trace and the sample and verified it.
Two people sign readinessThe ESG controller and the internal audit lead sign readiness. The meaning of each signature is recorded, and each remaining exception carries a reason code.
The assurer sees only what you releaseThe assurer works in a read-only room with the packs the controller released. Each release and each view is logged.
Each step on the audit trailEach action by people and agents is recorded in order, with what it touched. The trail cannot be edited. Threshold and rule changes are logged, and the trail exports for the assurer.
Configuration

ISSA 5000 readiness settings, taken from the engagement letter

Materiality, sampling and the rules that mark a layer weak are settings. Saved changes apply from the next run and are logged.

SettingDefaultChoose from
Performance materiality per figure5%From the engagement letter, or any value
Clearly trivial0.2%Differences below it are listed but not raised as findings
Readiness target95%Sign-off without reason codes needs this
Agent confidence for a person to review80%Below it, a person reviews before it counts
Sample size per high-risk figure25 itemsLast year's assurer sample size, or your own
Framework and assurance levelESRS (CSRD) · limitedESRS (CSRD) · ISSB IFRS S1/S2 · GHG Protocol only, each at limited or reasonable
An estimate still used 20 days after period endSource layer is WeakOn · Off
A sample difference above clearly trivialOffOn: the Sampler widens the sample by 10 items · Off
Connections

Statement, workbooks, meter data, ERP, HR and EHS behind each figure

Statement and workbooksthe draft sustainability statement and its calculation workbooks
Energy and meter datameter reads, supplier invoices and estimates, by site and month
ERPspend cube, accruals and company codes for Scope 3
HR systemworkers, grades, pay and leavers
EHS systemincidents, hours worked and contractors
Evidence library and registryinvoices, logs, sign-offs, control register and credit retirements
What it changes

ISSA 5000 readiness in fewer working days, with findings raised first

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
100%
of figures in assurance scope traced through five layers before fieldwork
Each figure in scope
every layer opens its source
target
9 in 10
of the assurer's likely findings raised and fixed before fieldwork
Todayfound in fieldwork
Target≥ 9 in 10 found first
target
2days
to answer an assurer request, with the evidence already cited
Todayweeks of email
Target≤ 2 business days

“Demo” means seen in the working solution, on its sample data. “Target” means the design goal, measured in the live solution. “Estimated” means our estimate, in working days for preparing one year's sustainability statement for limited assurance. “Typical” means published figures. IAASB, ISSA 5000: effective for periods beginning on or after 15 December 2026. IFAC, State of Play in Sustainability Assurance, 2024 data: 75% of large companies obtain some assurance. Accountancy Europe CSRD practice forum, 2026: sustainability controls are weaker than those for financial reporting. Names on the screens are sample data.

Questions

ESG data assurance and ISSA 5000 readiness questions from controllers

What is ESG Data Assurance Readiness?

ESG Data Assurance Readiness traces each reported ESG figure to its source evidence and controls, ready for ISSA 5000 assurance. Seven agents trace each figure through five layers, test controls and re-check samples. They also collect evidence and write the findings an assurer would likely raise. The ESG controller decides each finding and approves verified fixes. Before fieldwork, the controller signs readiness with internal audit.

What does ISSA 5000 readiness mean for a sustainability statement?

ISSA 5000 is the standard for assuring sustainability reports. It applies to assurance on periods beginning on or after 15 December 2026. Its assurers look beyond the printed total, at the reporting process, systems and controls behind each figure. Being ready means each figure in scope can be followed from the statement to its calculation, source system, control and evidence. The weak points are fixed before fieldwork starts.

How does it trace a figure back to source?

The Tracer finds the figure's calculation and re-computes it from its inputs. It reads each input in its system of record, read-only, and links the control and the evidence. Each of the five layers gets a status, a confidence and the source passage. The first weak layer is marked, for example three December site-months still on estimates.

Does it replace our assurer's testing?

No. The agents prepare you the way an assurer would test you. Your assurer still does its own sampling, and the Sampler does not replace it. The Mock assurer does not contact the real assurer. It writes the findings it expects, with its confidence, for the ESG controller to accept or dismiss.

What can the external assurer see?

Only the evidence packs the ESG controller releases, read-only. The Assurer liaison assembles each pack from cited sources and drafts answers to the assurer's questions, which the controller edits and sends. Each release and each view is logged.

Who accepts a likely finding or approves a fix?

The ESG controller. Agents read, draft and propose, but they do not approve. The controller accepts, edits or dismisses each finding with a reason code. The controller approves a fix only after the agents verify it, and signs readiness with the internal audit lead. Below 80% confidence, a person reviews before anything counts.

Which frameworks and assurance levels does it work with?

The scope is set in Settings. It can be ESRS (CSRD), ISSB IFRS S1/S2 or GHG Protocol only, for limited or reasonable assurance. Performance materiality, clearly trivial, sample size and the readiness target come from your engagement letter. They are settings too.

What do you need from us to start before fieldwork?

The Agentic Solution Engine builds and deploys it from your requirements and documents. Those are your draft statement, calculation workbooks, control register and engagement letter. It goes live once each quality gate has passed. We will walk you through it on your own statement first.

Test your ISSA 5000 readiness
on your own draft statement.

We'll run ESG Data Assurance Readiness on your own draft statement, its workbooks and the systems behind them.