Equipment Deficiency Management demo

A closed work order stays a claim for the integrity engineer until the reading, the repair record and the removed clamp prove the fix. 1:24

What the demo shows

Tracks equipment outside limits to a fix or justified decision, for integrity engineers.

Agents catch each finding as it leaves a report, find the limit it breached, draw its line, read round logs and test every closure against proof. An integrity engineer proposes, a superintendent decides, process safety countersigns running decisions past the day limit. Agents show the gap and draft; they never close.

Transcript

  1. Equipment Deficiency Management tracks equipment outside limits to a proven fix for integrity engineers.
  2. One regulator's 2007 to 2011 refinery inspections drew 63 citations for uncorrected deficiencies.
  3. Each line, time outside a limit, safeguards beneath, gaps plain.
  4. This Unit 21 clamps fixed today, job closed after 23 days.
  5. The agent finds no reading.
  6. Clamp on. 12 days without rounds.
  7. Joseph opens the records and sends it up.
  8. Carmen must open them herself.
  9. She reopens it with rounds and a December date.
  10. Process safety must still countersign the 40 days.
  11. Ask if the clamp is safe.
  12. A named person gets it.
  13. Say someone is down.
  14. Stop. Get clear and call.
  15. 814 of 9,800 closures show no proof.
  16. 813 still wait. Built on Botminds: agents, data, screens, and governance on one platform.

Transcribed from the film’s narration. Captions are on the player.