SystemSupply Chain

Drug Shortage Early Warning

A drug shortage early warning system that ranks each market by weeks to stock-out and shows the record behind each driver

See one case, screen by screen ↓
Watch with transcript →

Built forSupply continuity leadsSupply plannersMarket supply leadsHeads of supply riskQA release leads

The Problem Today

Shortage warning signs arrive in four places and are read by four teams, so a coming stock-out is found at the weekly planning meeting.

54 h
from a supplier delay notice to a signed plan, by hand our estimate

Four places, read by four teams

  • Planning
  • Quality
  • Mailbox
  • Shipments
  • The regulator's clock startsThe FDA notice is due five business days after an unforeseen interruption
  • Stock forecast rebuilt by handNobody counts all the warning signs against the stock at once

The Solution

  1. Each warning sign read as it arrivesPlanning export, quality holds, supplier emails and shipment exceptions
  2. Stock projected sixteen weeks aheadEach delay and hold taken out, and the stock-out week found
  3. Each fix shown with the cover it addsMoving stock, faster QA release, faster freight, each with the weeks it adds
  4. The continuity lead signsConfirms the risk and approves the plan. Tasks go to their owners

Built-in controls

  • Each driver cites its record
  • Quarantined stock not counted until QA releases it
  • Large buffer moves need a second approval

What You Get

Each fix is drafted, approved and assigned to its owner weeks before the projected stock-out.

  • Authority notice draftedThe FDA 506C notice or EU shortage report, from cited records
  • A plan signed in hoursFrom the delay notice to a signed plan with owners tasked
  • A ranked risk registerAlerts ranked by risk and break date, for the continuity meeting
In short

What is Drug Shortage Early Warning?

It is software that watches the signs that can take a medicine off the shelf. It warns the supply team before stock runs out. Drug Shortage Early Warning reads the manufacturer's planning export, quality records, CMO notices and shipment exceptions. It projects each product-market 16 weeks ahead and ranks alerts by their cited drivers. The continuity lead confirms and signs.

How to choose AI solutions for life sciences →

Updated

The problem

The warning signs of a drug shortage arrive early, but nobody adds them up

A drug maker's supply team must keep critical medicines in stock in every market it serves. The team thinks in weeks of cover: how many weeks the stock will last. The warning signs of a shortage arrive early. But they come in four separate places: the planning system, the quality system, the supply mailbox and the shipment exception feed. A quality problem puts a lot on hold, and a temperature problem in transit quarantines a shipment. A tender, a large public order, adds demand. A contract manufacturer (CMO) emails that a fill date has moved. Each sign is read by a different team. Nobody takes them all out of the market's projected stock at once to see what is left.

So a CMO's delay email can sit unread for a day while a quality hold and a tender use up the same weeks of cover. The coming stock-out is found at the weekly planning meeting, or at the pharmacy counter. By then the regulators' clocks are already running. Section 506C, the US rule on shortage notices, says the FDA must hear no later than five business days after an unforeseen interruption. That applies when the interruption is likely to meaningfully disrupt supply. In the EU, companies that hold a marketing authorization now report shortages through the European Shortages Monitoring Platform. That has been mandatory since February 2025.

typical216shortagesdrug shortages active in the US at the end of 2025
typical5business daysat most, to notify FDA under section 506C after an interruption that could not be foreseen
Where the hours go between a delay notice and a signed planestimated
By hand54 hours
With the solution3.5 hours
  • The notice waiting in the supply mailbox24 → 0.1 h
  • Matching the lot to the market pack and its open holds4 → 0.1 h
  • Rebuilding the 16-week stock projection6 → 0.1 h
  • Pulling quality, shipment and demand records together4 → 0.2 h
  • Finding donor markets, QA priorities and freight options8 → 1 h
  • Approvals, owner tasks and the authority notice decision8 → 2 h

Our estimate of the hours for one warning sign on a Tier 1 (most critical) product in one market, by hand and with the solution.

How it works

Signal to ranked shortage alert to signed plan, through six agents

What comes in
Signals in4 signal sources · planning, quality, suppliers, shipments
Agents at work
Coverage monitorweeks of cover
Quality hold watcherholds and test failures
Supplier & CMO notice readerdelay notices
Logistics exception watchershipments in doubt
Then
Risk scorer16-week projection
Then
Mitigation planner and notice writeroptions + effect
A person decides
Continuity leadconfirms the alert, approves the plan
What comes out
Ranked alert, every driver cited
Tasks to owners
Authority notice, when needed
One case, step by step

A CMO delay notice moves one market from watch to stock-out risk

A drug maker tracks seven critical medicines in 48 product-markets. A product-market is one product in one country. At 09:18 one morning, the contract manufacturer that fills its pens emails a delay notice. The late lot fills one biologic's 40 mg pen for Germany. Here is what happens next, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01Morning

    The shortage radar, with one notice not read yet

    Supply continuity lead, Europe and International

    Each sector of the radar is a product, and each dot is a market. The distance from the center shows the weeks until the projected stock-out. The 05:42 sweep has scored all 48 product-markets. The 40 mg pen in Germany is already an open alert at risk 61. It drops below safety stock in the coming weeks, with lowest cover of 0.6 weeks, but no stock-out is projected. Above the radar, a delay notice for one lot has arrived from the contract fill-finisher. It is marked not read yet.

    Drivers, ranked by weeks of cover lost. One lot on QA hold −1.7 wk · one shipment quarantined −1.1 wk · a regional tender adds 18% demand −0.8 wk.

  2. 02The next 16 weeks

    The open alerts on one cover horizon

    Supply continuity lead

    Below the radar, each alert's projected stock runs week by week, with the at-risk deliveries taken out. Safety stock is the amber line. The same biologic's 80 mg vial in Italy falls below safety stock. A 100 mg/10 mL vial in the US runs out if nothing is done. Three more products, in Brazil, France and Japan, are shown with their approved plans.

  3. 0309:24 · one click

    “Read it now”: the notice is read and the dot moves

    Supplier & CMO notice reader

    The notice reader reads the email on screen. It pulls out the lot, the dates and the quantity. The lot's fill date has moved, so 6,000 pens ship three weeks late. The reader matches the lot to the German pack, and the risk scorer rebuilds the projection. Germany rises from risk 61 to 86. Its dot moves inward to the 8-week ring and turns red.

    “Runs out in 54 days · 7.7 weeks if nothing is done.”

  4. 04The source

    The CMO's own words, highlighted

    Supply continuity lead

    The CMO delay is now driver 1, with a citation to the supply mailbox at 09:18. Opening it shows the email, with the passage the agents cite highlighted. The cause is a shortfall of syringe barrels at the CMO's own supplier, after a furnace repair. A second passage offers a way out. The lot can ship sooner if air freight is acceptable.

    “Read-only copy · the highlighted passage is the one the agents cite.”

  5. 05The alert

    Three supply events and a tender on the same six weeks

    Risk scorer

    The alert ranks four drivers, each with its record. The CMO delay costs 1.7 weeks of cover. So does a second lot of 6,000 pens, held by QA for visible particles found at AQL inspection, a standard sampling check. A shipment was quarantined after its temperature logger read 9.4 °C for 47 minutes, which costs 1.1 weeks. The health-insurer tender adds 560 pens a week of demand. The projected stock-out is 54 days away, with lowest cover at −0.5 weeks.

    “Agents raise alerts. A person confirms or dismisses.”

  6. 06Trying options

    Six options, three recommended, each with its effect on cover

    Mitigation planner and notice writer

    The planner drafts options from the network. Each has an owner, a cost and the weeks of cover it buys. One option moves 4,200 pens from the Netherlands and Austria (+1.2 wk). Another gives QA priority to the deviation, the open quality investigation, so 5,400 pens release sooner (+1.5 wk). A third sends the delayed lot by air freight (+1.7 wk). With the recommended set, the projected stock-out goes away. Lowest cover rises from −0.5 to 1.8 weeks.

    “Moves 24% of Austria’s buffer. The head of supply-chain risk approves.”

  7. 07Signed

    The continuity lead confirms the risk and approves the plan

    Supply continuity lead

    The confirmation shows the alert, the three options with their owners and the result: no stock-out, and lowest cover of 1.8 weeks. The continuity lead signs with a password and the meaning “I confirm this supply risk and approve the plan”. Austria gives more than a fifth of its buffer. So a request for a second approval from the head of supply-chain risk goes out with the signature.

    “Signed by the supply continuity lead · 09:24 · recorded in the decision log.”

  8. 08Plan in motion

    Tasks go to their owners, and no authority notice is needed

    Mitigation planner and notice writer

    The decision is recorded, and tasks go out. The reallocation goes to its named owner. QA priority goes to the QA release lead, and air freight to the global supply planner. A second approval waits with the head of supply-chain risk. No stock-out is projected, so no authority notice is needed, and the reason is recorded. The alert moves to Mitigating until cover stays above safety stock for four weeks.

  9. 09Meanwhile in the US

    A US vial on the 506C clock, two business days left

    Global supply planner, Americas

    The API supplier, the maker of the active ingredient, sends a force majeure notice. A reactor has shut down, and three API lots will be about six weeks late. That puts a 100 mg/10 mL vial in the US on course to run out. The authority notice tab counts the business days left. The notice writer drafts the 506C fields from the cited records, down to the reason, the expected duration and the contact.

    “The notice writer drafts from the alert and its records. Regulatory affairs files.”

  10. 1009:25 · Run the watch

    Three new records, one new alert

    The watch agents

    Running the watch reads the latest signals in parallel. A one-day port delay has no effect on supply. An update on the deviation says it is contained to tray 4, and links it to the German alert. A schedule change at one plant moves the Spanish pack run of a 15 mg product. That raises a new alert at risk 47. The planner drafts one option, and the alert waits for the continuity lead to confirm or dismiss.

Who it’s for

Continuity, planning, QA, risk and regulatory roles on one shortage

Five people act on one shortage alert. Here is each one's week by hand, then with the agents.

Supply continuity lead
Confirms alerts and signs plans
Before
Wants to know which market runs out first, and the email that says so. Today finds out from four systems and a mailbox, usually after the fact.
Now
Opens the radar to markets ranked by weeks to stock-out, each driver one click from its record. Confirms or dismisses, and signs the plan.
Global supply planner
Owns the Americas alerts
Before
Needs the date the plan breaks more than another dashboard. Re-plans batches by hand when an API supplier slips.
Now
Owns the Americas alerts in a register ranked by risk and break date. The options and their effect on cover are already drafted.
QA release lead
Owns holds, deviations and batch certification
Before
Wants one priority instead of five escalations. Hears about the supply impact of a hold from several markets at once.
Now
Receives one task, to give QA priority to one deviation and release 5,400 pens. The task shows the weeks of cover it buys. Release dates stay with QA.
Head of supply-chain risk
Gives the second approval
Before
Treats moving a quarter of a market's buffer as a personal call. Needs to see why before stock moves between markets.
Now
Gives second approval on any move of more than 20% of a market's buffer. Sees warning lead time, drivers and decisions on one dashboard.
Regulatory affairs lead
Files FDA 506C and EU shortage reports
Before
Finds that five business days go fast when nobody said a shortage was coming.
Now
Sees the 506C clock start with the first signal. Receives a drafted notice, each field cited, to review and file.
The agents

The early warning agents: four watchers, a risk scorer and a planner

Six agents read stock, quality, supplier and shipment signals, move each market on the radar and draft the plan. The continuity lead signs.

Coverage monitor

Reads the daily planning export: projected stock, deliveries and demand for 48 product-markets over 16 weeks. Works out weeks of cover. Flags any week under safety stock, and any change of more than 5% in deliveries or demand since yesterday.

  • Never edits the plan
  • Each figure cites its export row
Quality hold watcher

Checks the quality system every hour for batch holds, deviations, out-of-specification (OOS) results and certification queues. Maps each batch to the market packs it blocks, with quantity and expected release.

  • Read-only access to the quality system
  • Release dates come from QA, and any estimate is marked as one
Supplier & CMO notice reader

Reads the supply mailbox: delay notices, force majeure letters and capacity letters. Pulls out the supplier, the lot, the old and new date and the quantity, and quotes the passage. Marks price lists and routine letters as not a supply signal.

  • Quotes the sender’s words
  • Unclear notices go to a person
Logistics exception watcher

Reads the shipment exception feed every 15 minutes. That covers temperature excursions, customs holds and missed pick-ups. Each excursion comes with the logger reading and the product's stability budget, the time it may safely spend out of range. Finds the stock that is in doubt.

  • Never releases quarantined stock. QA decides
Risk scorer

Rebuilds each product-market's 16-week projection, with at-risk deliveries moved and demand changes applied. Reports lowest cover, the first week under safety stock and the stock-out week. Works out the weeks lost to each driver. Scores each risk from 0 to 100 by depth, timing and criticality tier.

  • Each driver cites at least one record
  • Agents raise alerts. A person confirms or dismisses
Mitigation planner and notice writer

Drafts options from the network: moving stock, QA priority, faster freight, registered alternate sites and phasing demand. Each comes with its effect on cover, its cost and its owner. Recommends the smallest set that keeps safety stock. Drafts the FDA 506C notice or EU shortage report when a shortage stays likely.

  • Drafts only. People approve and file
  • Moves over 20% of a market’s buffer need a second approval
Continuity lead

Confirms and approves.

Ask in plain words

Questions about products, markets and signals, answered from the records

Ask in plain words, or say what to watch. Each answer points to the record behind it. These answers use the sample data.

Why is the 40 mg pen in Germany at risk?

The pens in Germany are projected to run out in 54 days. Four things hit the same six weeks. The CMO delay on one lot and the QA hold on another cost 6,000 pens and 1.7 weeks each. A quarantined shipment costs 3,800 pens and 1.1 weeks. The regional tender takes 2,800 pens and 0.8 weeks. The recommended plan of moving stock, QA priority and air freight keeps cover above safety stock.

What happened to the quarantined shipment?

The shipment of 3,800 pens bound for Germany logged 9.4 °C for 47 minutes at a border stop. It is quarantined. The product allows up to 72 hours in total at 8 to 25 °C. So QA can likely release it once the logger file is checked, and that option is in the German plan. Until QA decides, the agents count it as lost.

Where can we take stock from?

The planner found 4,200 pens that can reach Germany in time while each donor keeps more than 6.5 weeks. That is 2,400 from the Netherlands (6.9 weeks after) and 1,800 from Austria (7.1 weeks after). Austria gives 24% of its buffer. So the request for second approval from the head of supply-chain risk goes out with your signature.

Draft the FDA notice for the US vial

The US vial needs a decision on the FDA 506C notice within five business days of the API supplier’s reactor shutdown. Two of those days are left. If nothing is done, US stock runs out, which counts as a likely meaningful disruption. I am drafting the notice on the alert now. Regulatory affairs files it.

The screens

The shortage radar, the cover horizon and the drafted FDA 506C notice

From the working solution, on its sample data. Pick one to see it large.

The shortage radarProducts as sectors, 48 product-markets as dots, and distance from the center as weeks to stock-out. The selected alert shows its cited drivers.
Cover horizonEach open alert's projected stock for the next 16 weeks, with at-risk deliveries taken out. It shows the lowest cover and the week it breaks.
A notice read in placeThe CMO delay read on screen. Lot, dates and quantity are pulled out, the risk rises from 61 to 86 and the dot moves to the 8-week ring.
The cited passageThe source email as a read-only copy, with the passages the agents cite highlighted.
The alertWhy it is at risk, drivers ranked by weeks of cover lost, the projected stock chart, the options and the records behind them.
Options and their effectThe recommended options selected. The projected stock-out is gone, and lowest cover rises from −0.5 to 1.8 weeks.
Confirm and signThe plan, its result, the second approval it needs and the meaning of the signature.
Plan in motionDecision recorded, tasks sent to their owners, second approval requested and the notice decision with its rationale.
Risk registerEach open alert ranked by risk, with tier, drivers, lowest cover, break date, stage and owner. It can be exported for the continuity meeting.
FDA 506C noticeThe business days left on the 506C clock and the drafted notice fields, each cited, ready to send to regulatory affairs.
SignalsWhat the watch agents read from each source, how a signal moves through them, and each record with the alert it raised or linked.
Continuity dashboardAlerts raised, confirmation rate, median warning, stock-outs avoided, lead-time trend, drivers, a risk heat map and decisions.
SettingsAlert windows by tier, the minimum risk score, Tier 1 safety stock and the sources the agents watch.
Governance

A person confirms each shortage alert, and a second person approves large buffer moves

Each driver cites its recordEach driver and number links to the export row, quality record, email or shipment exception it came from, with the passage highlighted. The source systems stay the record. The solution keeps a read-only, cited copy.
A named person confirms and signsAgents raise alerts and draft plans. Only the continuity lead confirms, dismisses or approves. The decision log records the name, the time and the meaning of the signature.
Second approval for large buffer movesMoving more than 20% of a market's buffer needs approval from the head of supply-chain risk. The request goes out with the continuity lead's signature. Stock waits for that approval before it moves.
Quarantined stock stays uncountedStock on QA hold or in quarantine is not counted until QA releases it. The agents do not release quarantined stock, and they say so whenever a release date is an estimate.
Regulatory affairs files the noticeThe notice writer drafts the FDA 506C notice or the EU shortage report from the cited records. Regulatory affairs reviews and files it. Agents do not contact authorities, suppliers or customers directly.
Decisions kept on the recordEach agent step is kept with who did it and when. So is each confirmation, each dismissal with its reason, each plan and each second approval. Dismissal reasons stay in the decision log, and rule changes go on the audit trail.
Configuration

Alert windows by criticality tier, risk scores and named approvers

When the agents raise an alert, what they watch and who decides are all settings. They apply at each sweep.

SettingDefaultChoose from
Tier 1: alert when cover will fall below safety stock within16 weeks6 to 26 weeks, in steps of 2
Tier 2: alert when cover will fall below safety stock within10 weeks4 to 20 weeks, in steps of 2
Minimum risk score to raise an alert4020 to 80, in steps of 5. Lower scores are kept as watch notes
Safety stock for Tier 1 products2 weeks of forward demand1 to 6 weeks
What the agents watchPlanning export, quality system, supply mailbox, shipment exception feedEach on or off · customs broker portal and market intelligence off
Confirm alertsEurope and International: supply continuity lead · Americas: global supply plannerA named approver per region, with a named alternate. They confirm or dismiss alerts and approve plans
Reallocation of more than 20% of a market’s bufferSecond approval: head of supply-chain riskHead of supply-chain risk or the continuity lead, before stock moves between markets
Authority notices (FDA 506C, EU shortage reports)Regulatory affairsRegulatory affairs or a named alternate. The notice writer drafts and regulatory affairs files
Connections

The planning, quality and mailbox data behind drug shortage early warning

Planning system exportprojected inventory, receipts and demand by SKU-market, daily
Quality systembatch holds, deviations, OOS results and the release queue, hourly
Supply mailboxsupplier and CMO delay notices, force majeure and capacity letters, email and PDF
Shipment exception feedtemperature excursions, customs holds and missed pick-ups, every 15 minutes
Critical product listcriticality tier, patient impact, alternatives and safety stock policy
Customs broker portalimport licenses and clearance status, when switched on
What it changes

Drug shortage early warning results: weeks of warning and alerts confirmed

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
7.4weeks
median warning before the projected stock-out, against a target of 6+
7.4 weeks of warning
on a 16-week look-ahead
target
82%
of alerts confirmed by planners, with the rest dismissed with a reason
alerts confirmed by planners
estimated
$41M
of sales at stake over four weeks in the sample case, across three projected stock-outs

Sources: ASHP drug shortage statistics, year-end 2025, with 216 active US shortages. FDA section 506C guidance, with notice due five business days after an unforeseen interruption. EMA European Shortages Monitoring Platform, mandatory since February 2025. “demo” means seen in the working solution, on its sample supply data. “target” means the design goal, measured in the live solution. “estimated” means our estimate. The 54 hours by hand is the sum of the estimated hours chart. “typical” means the published figures above. Names on the screens are sample data.

Questions

Drug shortage early warning system questions from supply continuity teams

What is a drug shortage early warning system?

It is software that watches the signs that can take a medicine off the shelf. It warns the supply team before stock runs out. Drug Shortage Early Warning reads the manufacturer's planning export, quality records, CMO notices and shipment exceptions. It projects each product-market 16 weeks ahead and ranks alerts by their cited drivers. The continuity lead confirms and signs.

How does it predict a stock-out?

The risk scorer rebuilds each product-market's 16-week projection. At-risk deliveries move to their new dates, and demand changes are applied. It reports the lowest cover, the first week under safety stock and the stock-out week. It works out the weeks lost to each driver. Then it scores the risk from depth, timing and the product's criticality tier.

Does it read supplier and CMO delay notices?

Yes. The Supplier & CMO notice reader reads the supply mailbox. It pulls out the lot, the old and new dates and the quantity, and quotes the sender's passage. Unclear notices go to a person. Price lists and routine letters are marked as not a supply signal.

Does it help with FDA 506C notifications and ESMP reporting?

Yes, when a shortage stays likely after the plan. The notice writer then drafts the FDA 506C notice or the EU shortage report from the cited records. The EU report goes through ESMP, the European Shortages Monitoring Platform. The alert shows the business days left. Regulatory affairs reviews and files, and the agents never contact an authority.

Does it count stock on QA hold or in quarantine?

No. Held and quarantined stock counts as at risk until QA releases it, and the agents do not release it. A temperature excursion is shown with the product's stability budget, so QA can decide.

Who confirms an alert, and who approves moving stock between markets?

Agents raise alerts and draft plans. The continuity lead confirms or dismisses, with a signature that records name, time and meaning. Moving more than 20% of a market's buffer needs a second approval from the head of supply-chain risk. Each dismissal keeps its reason.

Can we set our own alert windows and approvers?

Yes. The alert window for each criticality tier is a setting. So are the minimum risk score, Tier 1 safety stock, the sources watched and the approvers by region. You can also describe a new rule in plain words, such as alerting when a Tier 1 product drops under 6 weeks of cover.

What data do you need from us to start watching our critical list?

The Agentic Solution Engine builds and deploys it from your requirements and documents. That means your critical product list, planning exports, quality records and a sample of supplier notices. It goes live once each quality gate has passed. We will walk you through it on your own data first.

Point drug shortage early warning
at your critical product list.

We'll run Drug Shortage Early Warning on a sample of your own planning exports, quality records and supplier notices.