- Before
- “Tell me which market runs out first, and show me the email that says so.” Finds out from four systems and a mailbox, usually after the fact.
- Now
- Opens the radar to markets ranked by weeks to stock-out, each driver one click from its record; confirms or dismisses and signs the plan.
One delay notice, from the mailbox to a signed plan
Northwind Bio watches 48 product-markets of seven critical medicines. On Oct 7 at 09:18 its contract fill-finisher emails a delay notice for the lot that fills the German Veltrimab 40 mg pen. Here is what happens next, screen by screen, in the working solution.
- 01Morning
The shortage radar, with one notice not read yet
Lena Ortiz · Supply continuity lead, Europe and InternationalEach sector is a product, each dot a market, and the distance from the centre is the weeks to the projected stock-out. The 05:42 sweep has scored all 48 product-markets. Veltrimab 40 mg pen in Germany is already open as A-2611, risk 61: under safety stock Nov 16, lowest cover 0.6 weeks on Dec 14, no stock-out projected. Above the radar, a Halvorsen Fill-Finish delay notice for lot 2614 has arrived and is marked not read yet.
Drivers, ranked by weeks of cover lost: lot VLT-P-2611 on QA hold −1.7 wk · shipment SH-77421 quarantined −1.1 wk · regional tender adds 18% demand −0.8 wk.
- 02The next 16 weeks
Every open alert on one cover horizon
Lena Ortiz · Supply continuity leadBelow the radar, each alert's projected stock runs week by week with the at-risk receipts taken out and safety stock as the amber line. Veltrimab 80 mg vial in Italy breaks safety stock Nov 9; Talmirex in the US runs out Dec 21 if nothing is done; Corventa 15 in Brazil, Tessilor in France and Quorvanex in Japan are shown with their approved plans.
- 0309:24 · one click
“Read it now” — the notice is read and the dot moves
Supplier & CMO notice readerThe notice reader reads the email on screen and pulls the lot, the dates and the quantity: lot 2614 fill moves Oct 26 → Nov 16 and ships Dec 14, 6,000 pens three weeks late. It matches the lot to the German pack, and the risk scorer rebuilds the projection. Germany rises from risk 61 to 86, moves inward to the 8-week ring and turns red.
“Runs out Nov 30 · In 54 days · 7.7 weeks if nothing is done.”
- 04The source
The CMO's own words, highlighted
Lena Ortiz · Supply continuity leadThe CMO delay is now driver 1, with a citation to the supply mailbox, Oct 7 09:18. Opening it shows the email with the passage the agents cite highlighted: a syringe barrel shortfall at Halvorsen's sub-supplier after a furnace repair. A second passage offers a way out — lot 2614 can ship Dec 4 if air freight is acceptable.
“Read-only copy · the highlighted passage is the one the agents cite.”
- 05The alert
Three supply events and a tender on the same six weeks
Risk scorerThe alert ranks four drivers, each with its record: the CMO delay and lot VLT-P-2611 on QA hold for visible particles at AQL inspection (DEV-26-0418, 6,000 pens) at −1.7 weeks each, SH-77421 quarantined after its logger read 9.4 °C for 47 minutes at −1.1 weeks, and the health-insurer tender at +560 pens a week. Projected stock-out Nov 30, lowest cover −0.5 weeks, first week under safety stock Nov 16.
“Agents raise alerts; a person confirms or dismisses.”
- 06Trying options
Six options, three recommended, each with its effect on cover
Mitigation planner and notice writerThe planner drafts options from the network, each with an owner, a cost and the weeks of cover it buys: reallocate 4,200 pens from the Netherlands and Austria (+1.2 wk), QA priority on DEV-26-0418 to release 5,400 pens Nov 16 (+1.5 wk), air-freight lot 2614 (+1.7 wk). With the recommended set the stock-out goes from Nov 30 to none and lowest cover from −0.5 to 1.8 weeks.
“Moves 24% of Austria’s buffer — Omar Haddad approves.”
- 07Signed
She confirms the risk and approves the plan
Lena Ortiz · Supply continuity leadThe confirmation shows the alert, the three options with their owners and the result: no stock-out, lowest 1.8 weeks. Lena signs with the meaning “I confirm this supply risk and approve the plan” and her password. Because Austria gives more than a fifth of its buffer, the request for Omar Haddad's second approval goes out with her signature.
“Signed as Lena Ortiz · Supply continuity lead · Oct 7 09:24 · recorded in the decision log.”
- 08Plan in motion
Tasks to their owners; no notice needed
Mitigation planner and notice writerThe decision is recorded, and tasks go to Priya Raman for the reallocation, Dana Okafor for the QA priority and Sam Patel for the air freight. The second approval waits with Omar Haddad. With no stock-out projected, the authority notice is not needed and the rationale is recorded. The alert moves to Mitigating until cover holds above safety stock for four weeks.
- 09Meanwhile in the US
Talmirex: the 506C clock, two business days left
Sam Patel · Global supply planner, AmericasA force majeure notice from Kestrel Fine Chemicals — reactor R-4 shut down Oct 2, API lots K-77 to K-79 about six weeks late — puts Talmirex 100 mg/10 mL vials in the US on course to run out Dec 21. The authority notice tab counts the business days to Oct 9 and the notice writer drafts the 506C fields from the cited records, down to the reason, the expected duration and the contact.
“The notice writer drafts from the alert and its records; regulatory affairs files.”
- 1009:25 · Run the watch
Three new records, one new alert
The watch agentsRunning the watch reads the latest signals in parallel. A Rotterdam port delay of one day has no supply impact; a DEV-26-0418 update says the deviation is contained to tray 4 and links to A-2611; a Plant 2 schedule change moving the Spanish pack run of Corventa 15 mg to Nov 9 raises A-2613, risk 47. The planner drafts one option, and the alert waits for Lena to confirm or dismiss.