Reads each box, splits scans into reports and records the page behind each value.
- Never edits a document
- Holds an unreadable page instead of guessing
Decommissioning liability due diligence that prices each well, platform and pipeline from its own file, and shows who still stands behind it.
Follow the last box, from the fan to a signed ask ↓A late-life package comes with a closure schedule built on flat rates per well and per platform, plus a data room of well files, deeds, bonds and filings going back decades. The bid is due in days. The engineer samples a handful of well files, the estimator prices the rest at the same flat rates, and counsel reads the release if there is time.
Then the surprises arrive after closing. Wells listed as plugged have no plug record. A well card calls a job simple when an old workover report says a work string is still stuck in the hole. The bond the seller posted ends on sale, and the release says known or unknown. Once you hold the license, you are first in line.
Built forDeal leadsAbandonment engineersClosure cost estimatorsDeal counsel
Mature assets sell on one closure figure from a thin data room, and the buyer inherits what it misses.
Checked by hand today
Built-in controls
Deal teams take a tested number into the call, line by line, with the names of who agreed to it.
An offshore package of six platforms is for sale. The seller carries its closure at one figure, the data room has 14 boxes, and the last one came in overnight. Here is how the buyer’s desk gets from that box to a number it can defend on the call.
demoThe package, the companies, the people and every figure are sample data.
The fan sets the seller’s single number as a dashed line against every item at its low, central and high: $170.1M, $202.5M and $259.0M after 13 boxes. A bar underneath splits the width into known, guessed and missing evidence. The note on top is blunt: 241 scanned workover reports for one platform came in overnight, and nothing in the ask can be drafted until they are read.
The agents read the box and 240 of the 241 reports agree with their well cards. One does not. D-41 jumps to the top of the widest slices at $3.0M to $7.4M against the seller’s $0.90M, with a fish left at 6,200 ft. Even with every item at its low, the package now sits $23.0M over the seller.
The true-status table puts the seller’s word beside what the filings and reports show. The seller lists 208 wells as plugged; the records show 167. 25 have no plug record at all, and 16 are shut in or temporarily abandoned. The seller carries each at $0.00M, and each now has a range and an evidence mark beside it.
The sketch is drawn from the records, with the fish at 6,200 ft and the lower sand below it with no plug. Each fact is marked known, guessed or missing and cites its page. On a platform plugging unit at $180,000 a day, 13, 24 and 36 days give $3.00M, $5.10M and $7.40M. He puts the range forward with his reason.
She presses sign and gets a dialog instead. A checker opens what she checks, after it was put forward, and the engineer’s reading of the page does not count as hers. A signature on a $7.4M high case then means somebody on the bid read the evidence.
The scanned page opens with three passages marked: 340 ft of 2-7/8 in. work string and the packer left in the hole, the lower sand at 8,940 to 9,010 ft left below the fish with no plug, and the well recompleted above. The reader was 88% sure, with two figures checked against the daily log. The trail logs that she opened it.
Back on the well, the panel now reads signed by the deal lead on a range the engineer put forward, with her reason: the cost build matches the record. Maker and checker are different people for each range. If anyone changes the range later, the signature does not carry over to the new numbers.
The owners’ timeline runs from the first owner, since dissolved, through a second released by its deed, to the seller, released on paper by the draft sale agreement’s known or unknown wording. The who-pays ladder puts the buyer first for $5.10M and every other rung at $0. Across the package, $36.3M of security sits on paper and $0.00M of it is sure today.
The seller’s schedule uses four flat rates from a study that checked no well against its file. Pipelines left at no cost add $20.4M and down-hole trouble $22.4M. Wells listed as plugged with no record add $10.2M, and those still open $9.2M. Where the seller is high, on clean wells to 9,000 ft, the test says so: −$16.1M.
The estimator puts the ask forward. The deal lead signs it, having opened the seller test herself. Counsel opens the release section and countersigns. All four gates are ticked, including 12 of 12 wide ranges signed one by one. Besides the escrow, the ask strikes known or unknown from the release and makes the trust and the past owner’s share conditions of closing.
The same well, priced from its card and then from the report. Days are on a platform plugging unit at $180,000 a day.
| D-41 cost build | Low | Central | High |
|---|---|---|---|
| Before box 14 | $2.1M | $2.6M | $3.4M |
| Days on the well | 13 | 24 | 36 |
| Of which the fish | 4 days | 13 days | 21 days |
| Plugging unit | $2.34M | $4.32M | $6.48M |
| Services and cement | $0.66M | $0.78M | $0.92M |
| After box 14 | $3.00M | $5.10M | $7.40M |
demoSample data, from the working solution.
Three different things, and only some of it could ever pay the buyer’s cost. Counsel’s rulings on each one write the ask’s security line.
| Surety bond on one blockProtects the regulator, and ends on sale unless the surety agrees | $18.0M |
| Trust on another blockPasses only with the trustee’s written agreement | $9.4M |
| Past owner’s share of plugging, left under its capPasses only by written assignment | $8.9M |
| On paper behind the package | $36.3M |
demoSample data, from the working solution.
What counsel, the estimator and the auditor open on the same deal. Select one to enlarge it.
demoSample data, from the working solution.
Agents read, price and draft. These calls belong to the deal team.
Each one has a single job and a line it does not cross.
Reads each box, splits scans into reports and records the page behind each value.
Checks each well’s listed status against filings and reports.
Rebuilds casing, cement, zones, plugs and anything left in the hole, each fact marked known, guessed or missing.
Proposes low, central and high per item from days, rates and like wells.
Draws owners, bonds and funds for each well, and who pays.
Quotes release, assumption and consent wording and says what it would do.
Writes seller questions and the ask, each line tied to its proof.
Decommissioning liability due diligence tests what it will cost to plug the wells and remove the platforms, pipelines and caissons in a package before you buy it, and who else stands behind that cost. Here agents read the data room, price each item as a low, central and high range from its own file, and the deal team signs what goes into the bid.
The seller’s figure is usually flat rates per well and per structure. This rebuilds each well from its reports, so wells listed as plugged with no record, stuck tools, pipelines left at no cost and clean wells the seller priced high all show up as separate lines with their sources.
The ownership chain shows past owners, bonds, trusts and shares of cost for each well, and what the sale agreement’s release would do to them. It separates security that protects the regulator from money that could pay the buyer, and counsel rules on each before it reaches the ask.
Unreadable pages are held and stay out of the figures, and a well with a short file keeps its range wide. The fan shows how much of the total rests on known, guessed and missing evidence, so a thin room shows on the first screen.
The closure cost estimator puts the ask forward, the deal lead signs it after opening the seller test, and deal counsel countersigns after opening the release. The ask cannot be signed until each box is read, each wide range has its own signature and counsel has ruled.
No. The wellbore sketch is drawn from the records and is not a well program. The seller still operates the wells under its own permits, so questions about working a well go to your abandonment engineer.
Projects asked about again and again, seen on one line, each with its questions.
1-min demoProduction Sharing Contract ReviewFind the sentence that moves the deal, before the session.
1-min demoWell Report SearchA field’s well files in one picture, every pin on its page.
1-min demoWe’ll price its wells from their own files and show you the lines your bid should carry.