SystemCrew Management & Training

Crew Training Management

Crew training management that keeps every pilot trained before the grace month ends, even when a simulator goes down

See one case, screen by screen ↓
Watch with transcript →

Built forTraining schedulersFlight training directorsSimulator managersCheck airmenChief pilots

The Problem Today

Schedulers plan thousands of pilots in spreadsheets, so one simulator fault means a day of calls and grounded pilots.

8 h
of a scheduler's day lost when one simulator breaks our estimate
3 months
window to finish each training event, or the pilot is grounded published

Four lists, juggled by phone

  • Due dates
  • Simulators
  • Instructors
  • Trips
  • Classes trained too earlyPilots paid to wait for late aircraft
  • Rules checked from memoryRest, roster and consent, checked call by call

The Solution

  1. Each due date forecastEach pilot's base month and last day to train, before anything breaks
  2. Lost sessions re-plannedA simulator goes down; the sessions it hurts move to open periods
  3. Each move checked againRest, roster, instructor and pilot agreement, checked by a second agent
  4. The scheduler signsApprove, edit or reject each move, with a reason code and e-signature

Built-in controls

  • No base month moved without a person
  • Only a check airman signs a training record
  • A chained audit trail of each decision

What You Get

Sessions lost to an outage are re-planned inside each pilot's window, and new-type classes are paced to their aircraft deliveries.

$780K
of idle pilot time avoided on one class when deliveries slip our estimate
  • Trips kept off the reserve listA pilot rebooked in time keeps the trips on the roster
  • Simulator hours freedHours released when a class is paced to its deliveries
  • Consent followed upShort-notice consent requested and tracked pilot by pilot
In short

What is Crew Training Management?

Crew training management is planning and tracking each pilot's recurrent, upgrade and transition training against simulators, instructors and due dates, so no pilot falls out of qualification. A crew training management system brings crew qualification tracking, simulator scheduling and pilot training records together. Crew Training Management from Botminds gives that work to seven agents that forecast each base month and grace month, build the simulator plan, re-plan when a simulator or instructor drops out and check each other's moves, while the training scheduler approves and signs.

How to choose AI for airlines: a buyer's guide to agentic AI solutions →

Updated

The problem

Crew training plans that break the morning a simulator goes down

Crew training management starts with a fixed cycle: each airline pilot owes recurrent ground school, a simulator session, crew resource management, emergency drills and, for captains, a line check. Each event falls due in a base month, and under 14 CFR 121.401(b) training done in the month before or the month after still counts as on time. The month after is the grace month: miss it and the pilot comes off the line. Recurrent training scheduling means planning about 5,400 pilots against 20 simulators and about 200 instructors and check airmen, with due dates from the training records system, trips from crew scheduling, instructor availability from another list and simulator status by phone.

When a simulator faults, an instructor's standardization lapses or a pilot is pulled onto a trip, the scheduler re-plans by hand: who was booked, who is already in the grace month, where an open period is, whether the pilot is rested, whether the pilot agreement needs consent at short notice. Book too early and the base month resets. Train a transition class before its aircraft arrive and the airline pays pilots with nothing to fly while their landing recency runs out.

typical14.6%rise in one US leisure carrier’s 2024 labor cost, partly pilots trained for aircraft not yet delivered
Where a scheduler's hours go when a simulator breaksestimated
By hand8 hours
With the solution0.3 hours
  • Finding who was booked and each pilot’s last day to train1.5 → 0.0 h
  • Finding open periods on other simulators and centers1.5 → 0.0 h
  • Checking rest, trips and the pilot agreement for every move1.5 → 0.1 h
  • Finding a current check airman for each period1 → 0.0 h
  • Calling pilots for consent and confirming bookings2 → 0.1 h
  • Rebooking, travel and the record of who decided0.5 → 0.0 h

Estimated split for one simulator outage that hits 18 recurrent sessions, re-planned by hand and with the solution.

How it works

Pilot training scheduling from due date to a signed simulator plan

What comes in
Training data inEvery pilot · records, simulators, roster, instructors, deliveries
Agents at work
Due-date forecasterbase month + grace
Then
Training planner
Rebalancer
Then
Legality checker
Instructor matcher
Then
Delivery pacerclasses to aircraft
A person decides
Training schedulerapproves and signs
What comes out
Simulator plan
Due dates held
Signed records
One case, step by step

Crew training management on a morning a 787-9 simulator fails

A Monday morning at the airline's main flight training center: 5,420 pilots on five fleets, and 20 simulators and training devices across two training centers. At 04:10 the 787-9 full flight simulator in Bay 3 stopped mid-session. Here is how seven crew training management agents and one training scheduler handle it, screen by screen in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 0106:42

    The morning starts with what could ground a pilot

    Training scheduler

    The scheduler's Today screen says it in one paragraph: Bay 3 is down until Wednesday, the agents have re-planned the 18 sessions it hurts, and if the plan is approved, no one lapses. Three numbers sit under it (18 sessions at risk, 9 lapses forecast over the coming months, 467 of 485 pilots due this month trained or booked), then five items that need the scheduler, earliest lapse first. Below, the rebalancer waits in the conversation, ready for questions about the outage or any pilot, simulator or class.

    Today screen: “At 04:10 the 787-9 simulator in Bay 3 went down until Wednesday. The agents re-planned the 18 sessions it hurts: if you approve, no one lapses.”

  2. 0205:41 to 05:49

    Seven agents re-plan the outage before the scheduler arrives

    The training agents

    The plan opens on what happened: Bay 3's motion system failed during the 02:00 period, and the simulator operations manager expects it back Wednesday at 06:00. That puts 9 periods, 18 recurrent sessions, 9 pilots in their grace month and 38 trips next month at risk. Under it, each agent step is listed with its source: the rebalancer read the fault log and ranked the sessions, the training planner searched 787-9 capacity to the end of next month and paired the crews, the instructor matcher replaced a check airman, the legality checker sent one move back, the planner fixed it and priced the travel, and the records agent held the interrupted session. The last line hands the plan to the scheduler.

    “Handed to the training scheduler: approve, edit or reject each move; sign the plan.”

  3. 03The board

    The simulator board, with the plan already on it

    Training scheduler

    Simulator scheduling by bay and day: bays across, days down, each pilot pair with the last day each can train and a grace chip. Bay 3 is grayed, “Down · back Wed 06:00”. Its struck bookings show where each pair goes (11 to Bay 2 at the second training center, 7 back to Bay 3 early next month, still inside their grace month), and the proposed bookings wait on the receiving bay. Beside the board, the conversation with the agents says what broke, what they propose and where they disagreed.

    Training planner: “Travel goes down by $2,350. I am holding the second center's periods until 12:00.”

  4. 04Two disagreements

    A second agent checks each move and disagrees twice

    Legality checker

    The legality checker re-checks each move on its own against qualification, rest, roster, instructor, notice and consent, and base month. It disagreed twice. One first officer lands from a long-haul trip on Tuesday at 07:40, so a Tuesday 11:00 period at the second center would break the 10 hours of rest he needs before training; another first officer takes Tuesday 11:00, and he moves to Wednesday 11:00 with a seat-support captain. One check airman's standardization lapsed last month, so a check airman whose standardization is current takes Wednesday 06:30.

    The legality checker cannot change a move. It can only disagree, with the rule cited.

  5. 05The scheduler asks why

    A question in plain words, an answer with its sources

    Training scheduler

    Beside the board is the conversation with the training agents about this plan. The scheduler asks why the first officer is on Wednesday and not Tuesday. The legality checker answers with the roster entry, the rest rule and his grace month, each a source that opens, and offers to open his move.

    Legality checker: “His grace month ends at the end of this month, so he still has 10 days to spare.”

  6. 06Move by move

    Each move with six checks and its effect on the base month

    Training scheduler

    Each of the 18 moves shows the pilot, the seat, the base month, the last day to train, from and to, and six checks with their sources. For rest, the first officer's row reads “Lands Tue 07:40 · Wed 11:00 leaves 27 h rest (needs 10)”, and for base month, “Done in the grace month: base month stays September”. Consent is flagged: less than 7 days' notice and a new location. The scheduler can approve, edit or reject any move, or ask why.

  7. 0706:58

    One reason code, one electronic signature

    Training scheduler

    “What you sign” lists it plainly: 11 move to Bay 2 at the second center, 7 rebooked in Bay 3 inside their grace month, 11 consent requests, the interrupted session still held for its check airman, 0 base months changed and travel down $2,350. The scheduler picks reason code R2, Device outage, and ticks the line that makes it an electronic signature. Until this moment the agents had only held periods.

    The signature line names the plan, confirms the bookings and records the scheduler's electronic signature.

  8. 08By 07:09

    Eighteen rebooked, consent tracked, no one lapses

    The crew app

    The 18 sessions are booked (11 in Bay 2 at the second center and 7 in Bay 3 early next month), the holds are released, and the pilots see their new bookings in the crew app. The pilot agreement needs consent for a new training location at short notice, so 11 pilots get a request, due by 18:00. Ten accept within minutes; one first officer's is pending, and the planner keeps a fallback period for him. Lapses forecast over the coming months go from 9 to 0.

    “Consent · pilot agreement · 10 of 11 in · by 18:00.”

  9. 0904:16

    An interrupted session waits for the evaluator

    Check airman, AQP evaluator

    A captain and a first officer were in Bay 3 when the motion system failed during event 6, engine failure at V1. The records agent drafted the grade sheet from the device log and the evaluator's notes (events 1–5 graded, 6–9 not done) and held Bay 2 at the second center for Wednesday at 15:30. The check airman decides: events 1–5 stand and 6–9 finish in a 2-hour period, or the session is repeated in full. Only the check airman's signature closes it, and only signed records go to the Pilot Records Database.

    Records agent: “I do not change a grade, and I do not sign.”

  10. 10Saturday 09:12

    Transition training planning, paced to its aircraft

    Director of Flight Training

    On Saturday the delivery pacer read Friday's manufacturer notice: the first two A350 aircraft now arrive six weeks later than planned. As planned, the first A350 class would finish and leave 24 pilots waiting 8 weeks for line training. The pacer proposes a later start instead, which avoids about $780,000 of idle pilot time and frees 480 hours on the Bay 7 simulator. The director decides on Monday.

    Delivery pacer: “Nothing moves until the director approves.”

Who it’s for

Schedulers, simulator managers and check airmen in crew training

One broken simulator reaches four jobs at once, by hand and with the agents.

Training scheduler
Plans and re-plans simulator sessions
Before
Spends the whole day on the phone when a simulator goes down, and someone still ends up in the grace month.
Now
Opens a re-planned week with each move checked and cited, asks why where it matters, and signs it in one step.
Director of flight training
Owns the AQP, the budget and the instructor pool
Before
Does not want 24 pilots trained for an airplane that is still months away.
Now
Sees each upgrade and transition class against its aircraft deliveries, with the cost of any wait, and decides when a class moves.
Simulator operations manager
Runs 20 devices at two training centers
Before
Can say when a broken simulator comes back, and cannot say whose training it hurts.
Now
Reports an outage and the agents re-plan the sessions it hurts at once; sees each device's use, next maintenance and FAA evaluation date, and asks the agents where downtime hurts least.
Check airman
Grades 787-9 sessions as an AQP evaluator
Before
Decides what counts when a session stops halfway, and will not leave that to a computer.
Now
Gets grade sheets drafted from the device log and the evaluator's notes, decides interrupted sessions in person, and signs each record.
The agents

The forecasting, planning and checking agents behind crew training

The training scheduler signs a plan that seven agents forecast, build, re-plan and check move by move.

Due-date forecaster

Does the crew qualification tracking: computes each pilot's base month, grace window and last day to train for each event, six months out, under 14 CFR 121.401(b) and the AQP, and ranks pilots by last day to train.

  • Forecasts only; never books
  • Cites the rule for each date
Training planner

Builds the monthly simulator plan and proposes moves: pairs crews, picks device, center and period, and keeps travel and changes low.

  • Holds periods only; a person confirms
  • Never resets a base month on its own
Rebalancer

Starts when a simulator, an instructor or the roster breaks the plan, and re-plans only the sessions it hurts, ranked by last day to train.

  • Moves only what must move
  • Holds expire after 6 hours
Legality checker

Re-checks each proposed move on its own, independently of the planner: rest, trips, qualification, instructor currency, notice and consent, and the base month, each with its source.

  • Cannot change a move; it disagrees with the rule cited
  • Escalates anything unresolved to a person
Instructor matcher

Assigns instructors and check airmen by fleet, role, standardization currency, workload and contract limits, and flags any standardization due within 60 days.

  • Never assigns an instructor whose standardization is out of date
Delivery pacer

Reads manufacturer delivery notices and the fleet plan, works back from each aircraft to line training (IOE), and flags a class that would finish more than 3 weeks early, with the idle cost and the simulator hours a move frees.

  • Proposes only; the Director of Flight Training decides
Records agent

Drafts each session’s grade sheet from the device log and the evaluator’s notes, checks it is complete, holds interrupted sessions for the evaluator, and reports signed records to the Pilot Records Database.

  • Never signs
  • Never changes a grade
Training scheduler

Approves plans; the Director moves classes; check airmen sign records.

Ask in plain words

Questions to the training agents about pilots, simulators and classes

Ask about any pilot, simulator or class, or tell the agents what to do. Each answer cites the rule, the roster or the log it came from, and nothing changes until a person says so. These answers use the sample data.

Why is the first officer on Wednesday and not Tuesday?

He lands from a long-haul trip on Tuesday at 07:40. A Tuesday 11:00 period at the second center would break the 10-hour rest he needs before training, so I sent that move back. The planner gave Tuesday 11:00 to another first officer and moved him to Wednesday 11:00, with a seat-support captain. His grace month ends at the end of this month, so he still has 10 days to spare.

Who lapses if Bay 3 stays down until Friday?

If Bay 3 is back Friday 06:00 and not Wednesday, 10 more periods are lost, which is 20 sessions. The second center has no open 787 periods left after this plan. Six of the 20 pilots are in their grace month. I would swap them into Bay 4 with six pilots whose base month is next month, who keep their base month by training the month after. No one lapses, but it needs six more consents. Nothing changes until you ask me to.

What does the A350 delivery slip do to the first A350 class?

The manufacturer moved aircraft 1 and 2 back six weeks. As planned, the class would leave 24 pilots trained 8 weeks before an aircraft is there for their line training. I propose a later start, so they finish shortly before the aircraft arrive. That avoids about $780,000 of idle pilot time and frees 480 simulator hours on Bay 7. The Director of Flight Training decides.

How many simulator hours can we offer to partners?

Up to 516 hours: 480 on Bay 7 in early February if the first A350 class starts later, worth up to $384,000 at $800 an hour (estimated), and 36 night hours on Bay 6 at the second center next month, $25,200 at $700 an hour. Nothing is offered until the simulator operations manager approves.

The screens

The simulator board, the outage re-plan and an interrupted session

From the working solution, on its sample data. Pick one to see it large.

TodayThe crew training management home for the training scheduler: a simulator outage summarized in plain words, sessions at risk, lapses forecast, this month's pilots trained or booked, what needs the scheduler first, and the conversation with the training agents.
How the agents workedThe plan, step one: what broke, the sessions and pilots at risk, and each agent step of the re-plan in order, each with its source, handed to the scheduler.
The simulator boardSimulator scheduling by bay and day: each pilot pair with the last day to train and grace chips, the down bay struck through with proposed moves, and the agents’ plan conversation beside it.
Where the agents disagreedTwo disagreements, a rest conflict and a lapsed check airman standardization, with the first draft, the objection and the resolution, and each rule checked for all 18 moves.
Ask the training agentsThe scheduler asks why a first officer moved; the legality checker answers with the roster, the rest rule and his grace month as sources, and offers to open the move.
The moves, one by oneEach re-planned recurrent training session with from and to, six checks with their sources, the base-month effect, consent needs, and approve, edit or reject.
Approve and signOne approval with a reason code, an optional note and the scheduler’s electronic signature confirms the bookings the agents held.
Rebooked, with consent trackedEighteen sessions booked and the pilot agreement’s consent requests tracked pilot by pilot, with the 18:00 deadline and the one still pending.
A pilot’s training windowOne pilot's training record: month before, base month and grace month under 14 CFR 121.401(b), the warning against booking too early, and each recurrent event with its interval, last day and status.
Transition training against deliveriesTransition training planning for an A350 class paced to aircraft delivery: the delivery notice, the class as planned and as proposed, idle cost avoided, simulator hours freed and each phase.
An interrupted simulator sessionPilot training records for a session that stopped: the grade sheet drafted from the device log and evaluator notes, events done and not started, held for the check airman’s decision.
SimulatorsSimulator scheduling across 20 devices (18 full flight simulators and 2 flight training devices) with status, use this week, next maintenance and FAA evaluation date, and the agents ready to re-plan when an outage is reported.
Audit trailEach agent action and human decision in order, chained so that any change to an entry breaks the chain, kept 5 years, filtered by agents or people, with a chain check and CSV export.
Governance

Holds, second checks and signed records in crew training management

Agents hold; a person confirmsThe agents hold simulator periods; a booking is confirmed only after a person approves, and the agents do not move a class or sign a record. Holds expire after 6 hours if no one approves them: at 12:00 for this plan.
A second agent re-checks each moveThe legality checker re-checks each move independently of the planner against qualification, rest, roster, instructor currency, notice and consent, and the base month. Where they disagree, the screen shows both views and how it was resolved.
Base months kept unless a person choosesEach move states its effect on the pilot's base month under 14 CFR 121.401(b). The agents do not book earlier than the month before the base month unless a person chooses it.
Reason codes and electronic signaturesEach plan, move, class change and interrupted-session decision is signed by a named person with a reason code (device outage, instructor change, roster change, delivery change and more), and only the right role may approve each kind.
Training records signed by check airmen aloneThe records agent drafts grade sheets from the device log and the evaluator's notes; check airmen grade, decide what counts in an interrupted session, and sign. Only signed records are reported to the Pilot Records Database under 14 CFR Part 111.
A chained audit trail, kept 5 yearsEach agent action and each human decision is written in order and chained so that any change to an entry breaks the chain, kept 5 years, with a chain check and CSV export. Changes to training rules and thresholds need a second approval.
Configuration

Training windows, travel limits and pilot agreement rules the agents plan by

The events, windows and limits the agents plan by are settings. Changes need a second approval and go on the audit trail.

SettingDefaultChoose from
Warn before a grace month ends30 and 10 days30 and 10 days · 21 and 7 days · 45, 30 and 10 days
How far the agents may move a sessionAnother training centerAnother training center · Same training center only
Most travel per move$900$900 · $600 · $1,200
Holds expire after6 hours6 hours · 2 hours · 12 hours
Rest before training (pilot agreement §12.C)10 hours10 hours · 12 hours
Consent needed when the location changes with less than7 days’ notice7 days’ notice · 14 days’ notice
Flag a class that finishes before its aircraft by more than3 weeks3 weeks · 2 weeks · 4 weeks
Allow booking earlier than the month before the base monthOffOff — the agents never propose it, a person can still choose it · On
Connections

The training records system, roster, simulator log and fleet plan

Training records systemevents, base months and bookings for every pilot
Crew scheduling and rostertrips and rest; training bookings written back
Simulator maintenance logdevice faults and expected returns
Instructor recordscheck airman qualifications and standardization dates
Fleet plan and delivery noticesaircraft delivery dates for upgrade and transition classes
Pilot Records Database and crew appsigned records reported; consent requests and notices to pilots
What it changes

Crew training management results: lapses, idle pay and scheduler time

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
0
pilots lapsing because no simulator session was found in time: the plan's goal
Re-planned by hand9 lapse
With agents0
estimated
$780K
of paid, idle pilot time avoided when a 24-pilot A350 class moves with a six-week delivery slip
target
16min
of the scheduler's time to review and sign a re-planned simulator day, instead of a day of calls
By phonea day
With agents16 min

“demo” = seen in the working solution, on its sample airline data · “target” = the design goal, measured in the live solution · “estimated” = our estimate (the split of a scheduler’s hours; $780,000 = 24 pilots × 6 weeks × $282,000 a year in pilot pay and benefits ÷ 52; freed simulator hours at $800 an hour) · “typical” = published figures (a US leisure carrier’s 2024 annual report: labor cost up 14.6%, partly pilots trained for 737 MAX aircraft not yet delivered). 14 CFR 121.401(b) defines the month before, base month and grace month. Names on the screens are sample data.

Questions

Crew training management system questions from airline training departments

What is crew training management?

Crew training management is planning and tracking each pilot's recurrent, upgrade and transition training against simulators, instructors and due dates, so no pilot falls out of qualification. A crew training management system brings crew qualification tracking, simulator scheduling and pilot training records together. Crew Training Management from Botminds gives that work to seven agents that forecast each base month and grace month, build the simulator plan, re-plan when a simulator or instructor drops out and check each other's moves, while the training scheduler approves and signs.

How does the grace month work under 14 CFR 121.401(b)?

Each recurrent event falls due in a base month, and training completed in the month before or the month after counts as completed in the base month. FAA guidance calls the three months together the eligibility period; the month after is the grace month, the last chance before the pilot must requalify. The due-date forecaster computes these windows for each pilot and event, and each move states whether the base month is kept.

How do you re-plan pilot training when a simulator goes down?

When an outage is reported, the rebalancer ranks the sessions it hurts by each pilot's last day to train, the training planner finds periods on other simulators and centers, and the legality checker re-checks each move against rest, roster, qualification, instructor currency, consent and the base month. In the working solution, 18 sessions were re-planned in 8 minutes and the scheduler signed the plan at 06:58.

Can transition training be timed to aircraft delivery?

Yes. The delivery pacer reads manufacturer delivery notices and the fleet plan, works back from each aircraft to line training (IOE), and flags any upgrade or transition class that would finish more than 3 weeks before its aircraft, with the idle cost and the simulator hours a move frees. The Director of Flight Training decides.

Does it handle check airman and instructor scheduling?

Yes. For check airman scheduling, the instructor matcher assigns instructors and check airmen by fleet, role, standardization currency, workload and contract limits. It does not assign one whose standardization is out of date, and it flags standardization due within 60 days.

What can the agents book or sign without a person?

Nothing. The agents hold simulator periods and nothing is booked until a person approves; they do not move a class or sign a record. The training scheduler approves, edits or rejects each move with a reason code and an electronic signature, the Director of Flight Training decides class moves, and only a check airman signs a training record. Only signed records go to the Pilot Records Database.

Does it work with an AQP and a traditional training program?

Yes. AQP training management works the same way as a traditional program, because the events, intervals, windows and simulator requirements are settings. The sample airline runs an AQP for its 787-9 and 777-300ER fleets and a traditional Subpart N and O program for the others. Changes to the rules need a second approval and go on the audit trail.

What do we hand over to try it on our own training program?

The Agentic Solution Engine builds and deploys it from your requirements and documents: your training program, pilot agreement and simulator schedule. It goes live once each quality gate has passed, and we will walk you through it on your own training plan first.

Re-plan a past simulator outage
with your own training plan.

We'll run Crew Training Management on your own training program, simulator schedule and a past outage.