- Before
- Spends the whole day on the phone when a simulator goes down, and someone still ends up in the grace month.
- Now
- Opens a re-planned week with each move checked and cited, asks why where it matters, and signs it in one step.
Crew training management on a morning a 787-9 simulator fails
A Monday morning at the airline's main flight training center: 5,420 pilots on five fleets, and 20 simulators and training devices across two training centers. At 04:10 the 787-9 full flight simulator in Bay 3 stopped mid-session. Here is how seven crew training management agents and one training scheduler handle it, screen by screen in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 0106:42
The morning starts with what could ground a pilot
Training schedulerThe scheduler's Today screen says it in one paragraph: Bay 3 is down until Wednesday, the agents have re-planned the 18 sessions it hurts, and if the plan is approved, no one lapses. Three numbers sit under it (18 sessions at risk, 9 lapses forecast over the coming months, 467 of 485 pilots due this month trained or booked), then five items that need the scheduler, earliest lapse first. Below, the rebalancer waits in the conversation, ready for questions about the outage or any pilot, simulator or class.
Today screen: “At 04:10 the 787-9 simulator in Bay 3 went down until Wednesday. The agents re-planned the 18 sessions it hurts: if you approve, no one lapses.”
- 0205:41 to 05:49
Seven agents re-plan the outage before the scheduler arrives
The training agentsThe plan opens on what happened: Bay 3's motion system failed during the 02:00 period, and the simulator operations manager expects it back Wednesday at 06:00. That puts 9 periods, 18 recurrent sessions, 9 pilots in their grace month and 38 trips next month at risk. Under it, each agent step is listed with its source: the rebalancer read the fault log and ranked the sessions, the training planner searched 787-9 capacity to the end of next month and paired the crews, the instructor matcher replaced a check airman, the legality checker sent one move back, the planner fixed it and priced the travel, and the records agent held the interrupted session. The last line hands the plan to the scheduler.
“Handed to the training scheduler: approve, edit or reject each move; sign the plan.”
- 03The board
The simulator board, with the plan already on it
Training schedulerSimulator scheduling by bay and day: bays across, days down, each pilot pair with the last day each can train and a grace chip. Bay 3 is grayed, “Down · back Wed 06:00”. Its struck bookings show where each pair goes (11 to Bay 2 at the second training center, 7 back to Bay 3 early next month, still inside their grace month), and the proposed bookings wait on the receiving bay. Beside the board, the conversation with the agents says what broke, what they propose and where they disagreed.
Training planner: “Travel goes down by $2,350. I am holding the second center's periods until 12:00.”
- 04Two disagreements
A second agent checks each move and disagrees twice
Legality checkerThe legality checker re-checks each move on its own against qualification, rest, roster, instructor, notice and consent, and base month. It disagreed twice. One first officer lands from a long-haul trip on Tuesday at 07:40, so a Tuesday 11:00 period at the second center would break the 10 hours of rest he needs before training; another first officer takes Tuesday 11:00, and he moves to Wednesday 11:00 with a seat-support captain. One check airman's standardization lapsed last month, so a check airman whose standardization is current takes Wednesday 06:30.
The legality checker cannot change a move. It can only disagree, with the rule cited.
- 05The scheduler asks why
A question in plain words, an answer with its sources
Training schedulerBeside the board is the conversation with the training agents about this plan. The scheduler asks why the first officer is on Wednesday and not Tuesday. The legality checker answers with the roster entry, the rest rule and his grace month, each a source that opens, and offers to open his move.
Legality checker: “His grace month ends at the end of this month, so he still has 10 days to spare.”
- 06Move by move
Each move with six checks and its effect on the base month
Training schedulerEach of the 18 moves shows the pilot, the seat, the base month, the last day to train, from and to, and six checks with their sources. For rest, the first officer's row reads “Lands Tue 07:40 · Wed 11:00 leaves 27 h rest (needs 10)”, and for base month, “Done in the grace month: base month stays September”. Consent is flagged: less than 7 days' notice and a new location. The scheduler can approve, edit or reject any move, or ask why.
- 0706:58
One reason code, one electronic signature
Training scheduler“What you sign” lists it plainly: 11 move to Bay 2 at the second center, 7 rebooked in Bay 3 inside their grace month, 11 consent requests, the interrupted session still held for its check airman, 0 base months changed and travel down $2,350. The scheduler picks reason code R2, Device outage, and ticks the line that makes it an electronic signature. Until this moment the agents had only held periods.
The signature line names the plan, confirms the bookings and records the scheduler's electronic signature.
- 08By 07:09
Eighteen rebooked, consent tracked, no one lapses
The crew appThe 18 sessions are booked (11 in Bay 2 at the second center and 7 in Bay 3 early next month), the holds are released, and the pilots see their new bookings in the crew app. The pilot agreement needs consent for a new training location at short notice, so 11 pilots get a request, due by 18:00. Ten accept within minutes; one first officer's is pending, and the planner keeps a fallback period for him. Lapses forecast over the coming months go from 9 to 0.
“Consent · pilot agreement · 10 of 11 in · by 18:00.”
- 0904:16
An interrupted session waits for the evaluator
Check airman, AQP evaluatorA captain and a first officer were in Bay 3 when the motion system failed during event 6, engine failure at V1. The records agent drafted the grade sheet from the device log and the evaluator's notes (events 1–5 graded, 6–9 not done) and held Bay 2 at the second center for Wednesday at 15:30. The check airman decides: events 1–5 stand and 6–9 finish in a 2-hour period, or the session is repeated in full. Only the check airman's signature closes it, and only signed records go to the Pilot Records Database.
Records agent: “I do not change a grade, and I do not sign.”
- 10Saturday 09:12
Transition training planning, paced to its aircraft
Director of Flight TrainingOn Saturday the delivery pacer read Friday's manufacturer notice: the first two A350 aircraft now arrive six weeks later than planned. As planned, the first A350 class would finish and leave 24 pilots waiting 8 weeks for line training. The pacer proposes a later start instead, which avoids about $780,000 of idle pilot time and frees 480 hours on the Bay 7 simulator. The director decides on Monday.
Delivery pacer: “Nothing moves until the director approves.”