Blind List Verification demo

Isolation coordinators see each boundary flooded out from the work point on the current drawing, before a carried-forward blind list is walked. 1:16

What the demo shows

Checks blind lists against P&IDs, work packs and permits, for isolation coordinators.

Agents read the list, the current drawings and every plant change, open ones too, then flood outward from each work point. Only a blind holds; a closed valve never counts. The coordinator fixes what escapes, a foreman tags the flange, an area operator confirms it, and a shift lead signs. That signature covers the drawing: an operator still walks every line before it is opened.

Transcript

  1. Blind List Verification checks blind lists against today's drawing, for isolation coordinators.
  2. A blind list can be right line by line, and still leak around a blind.
  3. E2417A's six blinds held in 2025 only on a locked valve.
  4. Planned for day 12, it escapes.
  5. A 2024 bypass reaches live steam.
  6. Mehmet adds a seventh blind.
  7. A twin flange sits five feet away on live sour gas.
  8. The request goes to the foreman.
  9. Tag this flange, never it's twin five feet away.
  10. Whoever made a change never signs it, and a failing boundary is never signed in a batch.
  11. Before a bolt is touched, 47 sample boundaries fail on the drawing.
  12. Every step is on the audit trail.
  13. Built on Botminds: agents, data, screens, and governance on one platform.

Transcribed from the film’s narration. Captions are on the player.