As-Built Reconciliation demo

Disagreements between drawings, registers, datasheets and field records named, and the shortest field walk planned for the as-built engineer. 1:24

What the demo shows

Cross-checks drawings, registers, datasheets and field records; engineers settle each conflict.

Agents read five sources every night, name every disagreement and draw the shortest walk for what matters most. A technician photographs each stop. An engineer settles each conflict with a reason, a second person checks every safety item and a sample of the rest, and each fix goes through management of change. Agents never rule and never change a record.

Transcript

  1. As-Built Reconciliation cross-checks drawings, registers, datasheets and field records for terminal engineers.
  2. Five sources disagree 11,940 times.
  3. Route 47 goes first before tanker loads.
  4. Rosa photographs the surge relief skid.
  5. Every record looks fine, but the photo shows a needle valve none carry, able to blind a relief.
  6. She finishes the walk and retakes one blurred plate at stop two.
  7. A 1994 hand markup in a binder explains it.
  8. Nasreen rules with a reason.
  9. Operations must decide before the tanker.
  10. Tomas opens the photo and the binder page before he countersigns.
  11. Malik registers the change.
  12. Operations and process safety review it next.
  13. 5,160 field conflicts fall into 86 walks, about 280 hours.
  14. Built on Botminds: agents, data, screens, and governance on one platform.

Transcribed from the film’s narration. Captions are on the player.