Airline fleet planning that prices every delivery slip and lease extension, route by route, before the fleet committee

Lease extensions, returns and delivery slips priced, route by route, before the committee.

See one case, screen by screen ↓
demo6widebodies shortof the network plan in summer 2027 if nothing is done, found the morning after a nine-month 787-10 slip
demo$5.4Mlowerlower total effect from extending four 777-200ER leases than from absorbing the slip, on the sample fleet: $56.4M against $61.8M
target100%of options priced with rent, heavy maintenance, fuel, wet lease and revenue at risk, and checked blind, before the fleet committee
target1dayfrom a manufacturer's notice to checked, priced options, while lease notice dates are still open
In short

What is Airline Fleet Planning?

Airline fleet planning decides how many aircraft of each type an airline flies in every quarter for the next five to ten years: deliveries from the order book, leases that end or are extended, and old aircraft retired, which makes aircraft retirement planning part of the same count. As airline fleet planning software, Airline Fleet Planning puts that plan on one horizon against the network plan, with seven agents that re-count the fleet after every notice, build and price options route by route and check them blind — the Director of Fleet Planning chooses, finance checks and the VP Fleet signs.

How to choose AI for airlines: a buyer's guide to agentic AI solutions →

Updated

The problem

Why airline fleet planning still waits for the quarterly refresh

Airline fleet planning answers one question for the next five to ten years: how many aircraft of each type the airline flies in every quarter. Deliveries come from the order book, leases end or are extended, old aircraft retire. It is the airline's fleet strategy in numbers. At many airlines, aircraft fleet planning still lives in a spreadsheet, one row per tail, refreshed each quarter — and network, crew, maintenance, finance and treasury all build on it.

When a manufacturer moves deliveries, an analyst re-counts the fleet by hand, network planning re-checks the routes a week later against a count that is already out of date, finance prices one option, and the fleet committee sees one answer, priced on rent alone. Aircraft lease end planning slips with it: notice dates pass while the analysis runs. Heavy maintenance on an extended old aircraft is found after the extension is signed. Delay compensation in the purchase agreement often goes unclaimed, because nobody connected the notice to the article.

typical53%of the world's commercial fleet is leased, so every lease end is a fleet decision
typical9,300aircraftin one airframer's backlog in September 2026 — order books at record size, and deliveries slip
typical40%more narrowbody engine shop visits forecast for 2025 than for 2024, each taking an aircraft out of service for months
Where the working days after a delivery notice goestimated
By hand18 days
With the solution1.7 days
  • Reading the notice and tying it to the purchase agreement and the leases2 → 0.1 d
  • Re-counting the fleet by type and quarter in the spreadsheet4 → 0.1 d
  • Network planning re-checking routes and seasons5 → 0.2 d
  • Pricing rent, heavy maintenance, fuel and wet lease for each option4 → 0.3 d
  • Writing, checking and signing the fleet committee paper3 → 1 d

Estimated split for one delivery slip at a network carrier, by hand and with the solution.

How it works

From a delivery notice to a signed committee paper

Seven agents read every notice, re-count the fleet, build and price options and draft the paper; people choose and sign.

What comes in
Fleet records inevery notice, every lease · register, order book, leases, network plan
Agents at work
Signal watcherreads every notice
Then
Fleet model agent13 quarters re-counted
Scenario builderoptions on request
Then
Network coverage agentroute by route
Cost agentline by line
Then
Checker agentre-computes blind
Committee pack writercited paper
A person decides
Director of Fleet Planning, Fleet Finance, VP Fleetcompare and choose; check; sign
What comes out
Options priced against the network
One chosen, with a reason
Committee paper signed
One case, step by step

Airline fleet planning, screen by screen: one delivery slip to a signed committee paper

Corvane Airways — a fictional network carrier with 302 aircraft in service and 78 on order, flying its widebodies out of JFK — receives a delivery notice at 17:52 on Oct 14: all twelve 787-10s move nine months. Here is what happens next in the working solution: the agents work overnight, the Director of Fleet Planning asks them questions in plain words, and every answer comes with its source.

  1. 01Thursday, 06:46

    The agents built two options before she arrived

    Dana Whitfield · Director of Fleet Planning

    Dana's Today screen opens on four numbers: 302 aircraft in service, 78 on order, 35 leases ending in 24 months and 6 widebodies short in summer 2027 if nothing is done. Under “Needs you”: choose an option for the 787-10 slip, paper due Fri, Oct 23. She asks the agents what the slip costs. The Cost agent answers: doing nothing puts $61.8M of revenue at risk across three seasons; extending four 777-200ERs costs $47.0M and leaves $9.4M at risk.

    “Delay compensation under the purchase agreement may be claimable after 180 days; I have not counted it until Legal confirms.”

  2. 0206:30, before she arrived

    An aircraft delivery delay, read and sized overnight

    Signal watcher

    The Signal watcher read delivery notice DN-787-26-041 under purchase agreement PA-3722: March 2027 becomes December 2027, and the last aircraft moves from February to November 2028. The slip is above the 60-day threshold in Settings, so it asked for options. The Fleet model agent re-counted the widebody fleet: up to 6 short of Network Plan NP-2027 v3 in Q3 2027, the summer peak.

    “Below the threshold I only update the fleet plan and tell you.” — Signal watcher

  3. 03The fleet plan

    Every widebody on one horizon, options as tabs

    Scenario builder

    The fleet plan stacks the widebody fleet by type for 13 quarters, Q4 2026 to Q4 2029, with arrivals and departures above each column, extended leases hatched and the network plan's need as a dashed line. Above it, the fleet plan scenarios: S-14 extends four 777-200ERs 11 to 17 more months for $47.0M, 2 short at worst; S-13 absorbs the slip, $0.0M and 6 short at worst; S-12, Elena Vasquez's request to retire the 767s a year early, is not priced yet.

  4. 04One click on Q3 27

    What arrives, what leaves, and why

    Fleet model agent

    In S-14, Q3 2027 has 122 widebodies against 124 the network plan flies: 2 short. The quarter lists every aircraft that moved, such as 787-10 L1446, due Jul 2027 and now Apr 2028, and the extended 777-200ERs still flying, each cited to the fleet register, the order book or the lease records.

    The Fleet model agent counts from records only, never estimates.

  5. 05S-14, line by line

    Lease extension analysis on more than rent

    Cost agent · Checker agent

    Lease extension rent is $16.2M over 55 aircraft-months. Heavy maintenance to keep two 21-year-old aircraft flying is $18.8M: N774CV's 12-year check in May 2027 ($7.2M) and N772CV's engine 2 shop visit in July 2027 ($11.6M). Extra fuel is $12.0M, because the 777-200ER burns about 19% more per trip than the 787-10. The Checker re-counted 13 quarters and re-priced it from the sources, without the other agents' working: within 1%.

    “Not counted: possible delay compensation under PA-3722 Article 9.3. Jonathan Reyes classifies the delay first.”

  6. 06Route by route

    Widebody capacity, route by route and season by season

    Network coverage agent

    The eight routes planned for the 787-10 are checked against the network plan for summer 2027, winter 2027–28 and summer 2028. In S-14, 7 of 8 are at plan in summer 2027. JFK–ATH, new this summer, starts at 4 flights a week instead of 7: 954 seats a week short each way and $9.4M of revenue at risk, valued from the network plan's revenue per weekly frequency.

    The Network coverage agent never changes the network plan; Elena Vasquez owns it.

  7. 07In conversation

    “Give me an option with two wet leases”

    Dana Whitfield · Director of Fleet Planning

    Dana asks in plain words, and watches the agents plan, build, count, price and check it into a new tab. S-15 extends N771CV and N775CV and wet-leases two widebodies June 1 to September 30, 2027. Fleet cost is $42.6M, $4.4M less than S-14 — but it is one widebody short all winter, with $16.2M of revenue at risk. The wet-lease quote expired Sep 30, so confidence is 74%.

    The Scenario builder builds options; it never chooses one and never contacts a lessor.

  8. 08Side by side

    Wet lease versus lease extension, on total effect

    Dana Whitfield · Director of Fleet Planning

    Same assumptions, same sources. S-14: $47.0M fleet cost, $9.4M at risk, total effect $56.4M, 1 quarter short. S-15: $42.6M, $16.2M at risk, total effect $58.8M, 4 quarters short. S-14 commits 55 aircraft-months and $18.8M of heavy maintenance; S-15 commits 26 plus 8 wet-lease months and none. The lowest total effect is marked; the choice is hers.

  9. 09Her decision

    Chosen with a reason code, and signed

    Dana Whitfield · Director of Fleet Planning

    Dana chooses S-14 for the fleet committee with reason FC-COST — lowest total effect: fleet cost plus revenue at risk. She ticks that she has read the evidence and signs. The Committee pack writer drafts paper FC-26-19 for Oct 28 with S-14 recommended and the others as alternatives.

    “I have read the evidence. Sign as Dana Whitfield, Director of Fleet Planning.”

  10. 10Before Oct 28

    Finance checks, the VP signs, the committee decides

    Tom Okafor · Ruth Halvorsen

    The paper sets out the decision asked, what changed, the three options, the recommendation, the risks, what is not counted and the assumptions — every number cited. Tom Okafor signs the finance check, Ruth Halvorsen signs for Fleet, and FC-26-19 goes on the agenda for Oct 28, chaired by Gregory Ames, with its 11 sources.

    The Committee pack writer never signs or sends.

Who it’s for

Built for everyone who carries the fleet plan.

The same delivery slip, seen by five of the people who carry it — what the weeks after a notice looked like, and what they look like now.

DW
Dana WhitfieldDirector of Fleet Planning · chooses for the committee
Director of Fleet Planning
Before
“Tell me what the slip costs, route by route, and give me options I can defend.” Today the committee sees one option, priced on rent.
Now
Opens the morning after a notice with options already built, priced and checked; asks for more in plain words and chooses with a reason code.
ML
Marcus LinFleet Planning Analyst · builds options, keeps assumptions
Fleet Planning Analyst
Before
“I spend the week rebuilding the spreadsheet instead of thinking about the answer.”
Now
Reviews what the agents re-counted, quarter by quarter, and spends his time on the options; he builds them, while choosing and signing stay with Dana.
EV
Elena VasquezVP Network Planning · owns the network plan
VP Network Planning
Before
“Don't give me aircraft counts. Tell me which routes fly.”
Now
Sees every option route by route and season by season, with seats and revenue at risk, and can protect a route for the next option.
TO
Tom OkaforFleet Finance Manager · finance check, cost assumptions
Fleet Finance Manager
Before
“Every number in that paper is mine once I sign it.”
Now
Approves assumption changes like the fuel price before any option is re-priced, and signs the finance check against cited sources.
RH
Ruth HalvorsenVP Fleet and Asset Management · signs for Fleet
VP Fleet and Asset Management
Before
“Three priced options, one recommendation, no surprises.”
Now
Signs a paper with every option priced on total effect, checked blind and checked by finance, before it reaches the committee.
Built on the engine

7 agents. Each with one job, and hard limits.

Seven agents read every notice, re-count the fleet, build and price options and draft the paper; people choose and sign.

Signal watcher

Reads manufacturer delivery notices, lessor letters, shop-visit forecasts and network plan versions, and says what each changes in the fleet plan, with the passage. When a delivery moves more than the threshold, it asks the Scenario builder for options.

  • Reads only; never replies to a lessor or manufacturer
  • Every change cites its passage
Fleet model agent

Keeps the fleet by type at every quarter end to 2029 and every year end to 2033, from the fleet register, the order book, lease ends and retirements, and shows each aircraft that arrives or leaves and why.

  • Counts from records only, never estimates
Scenario builder

Builds fleet plan scenarios on request, or when a signal crosses a threshold — lease extensions, wet leases, deferred retirements — and explains each in one sentence.

  • Builds options; never chooses one
  • Never contacts a lessor
Network coverage agent

Checks every option route by route and season by season against the network plan: the frequencies each route keeps, the seats a week short and the revenue at risk, valued from the network plan's revenue per weekly frequency.

  • Never changes the network plan
Cost agent

Prices each option line by line against the base plan: lease extension rent, heavy maintenance, fuel, wet lease and revenue at risk, with a tag and a confidence on every figure.

  • Never counts delay compensation Legal has not confirmed
  • Every figure tagged
Checker agent

Starts from the sources, not the other agents' working: re-counts the fleet and re-prices every option, passes it within 1% or challenges it, and flags any expired quote or stale assumption.

  • Cannot change a figure, only pass or challenge it
Committee pack writer

Drafts the fleet committee paper in the committee's format — decision, what changed, options, recommendation, risks, assumptions — with every number cited.

  • Never signs or sends
Director of Fleet Planning, Fleet Finance, VP Fleet, fleet committee

Choose with a reason code; finance checks; the VP signs; the committee decides. The agents propose; a named person decides.

Ask in plain words

Ask the fleet planning agents, in plain words

Ask about an option, a route, an aircraft or a lease — or tell the agents what to build. Every answer cites its source, and nothing changes until a person approves it.

What does the slip cost us?

Doing nothing puts $61.8M of revenue at risk across three seasons. Extending four 777-200ERs costs $47.0M and leaves $9.4M at risk. Delay compensation under the purchase agreement may be claimable after 180 days; it is not counted until Legal confirms.

Why these four 777-200ERs?

Their leases end February to June 2027, right when the 787-10s were due. Two have extension options: N774CV for 12 to 24 months and N775CV with notice by Dec 1. Kestrel has offered N771CV at $286,000 a month. N772CV has no option; Brightwater must agree.

What if Brightwater gives only six months?

With 6 months, N772CV goes back in September 2027 and winter 2027–28 is one widebody short; JFK–LIS would drop to 5 a week. At $305,000 for 12 months, S-14 costs $0.18M more. The Scenario builder suggests asking for 12 at $305,000.

What if fuel is $2.80 a gallon?

The extra fuel in S-14 rises from $12.0M to $13.7M, so S-14 costs $48.7M; S-15 rises to $43.5M. The ranking on total effect does not change: S-14 $58.1M, S-15 $59.7M. Nothing is changed: the fuel price is an assumption Tom Okafor owns, so it goes to him as a proposed change.

Every screen

The working solution, as it ships.

13 screens from the working solution, on its sample data. Pick one to see it large.

Today: the fleet planning morningThe Director of Fleet Planning's morning: fleet in service, aircraft on order, leases ending, widebodies short, what needs a decision, and the fleet planning agents answering with sources.
Fleet plan scenarios on one horizonThe widebody fleet stacked by type for 13 quarters against the network plan, with fleet plan scenarios as tabs: lease extension, absorb the slip, and the request to retire the 767s a year early.
One quarter, every aircraft that movesClick a quarter to see each delivery delay, lease end and retirement that moves the count, and the gap to the network plan, every line cited.
Delivery delay notices and lessor lettersEvery manufacturer delivery notice, lessor letter and shop-visit forecast the agents read, with the delay's impact on the fleet plan and what the agents did.
Lease extension analysis, line by lineLease extension rent, heavy maintenance, fuel and revenue at risk, each tagged with a confidence, the risks, and how each agent built and checked it.
Widebody capacity by route and seasonWidebody capacity planning against the network plan: the routes planned for the 787-10, season by season, with frequencies flown, seats a week and revenue at risk in each option.
A wet-lease option built in conversationAsked for an option with two wet leases, the agents build it, re-count the fleet, check every route, price it and re-check it blind.
Wet lease versus lease extensionOptions side by side on the same assumptions: fleet cost, revenue at risk, total effect, quarters short, routes at plan, aircraft-months and heavy maintenance.
Fleet plan assumptions with ownersFuel price, fuel burn, extension rents, wet-lease rate and revenue per frequency, each with a source and an owner; a what-if becomes a proposed change for finance to approve.
Choose with a reason codeThe Director of Fleet Planning chooses the option for the fleet committee with a reason code and signs that she has read the evidence.
The fleet committee paper, signedThe committee paper drafted with every number cited, the finance check and the VP Fleet's signature, and on the agenda for the fleet committee.
Audit trail of fleet decisionsEvery action by a person or an agent — what, when, on which option, with the reason code — exportable as an evidence pack.
Fleet planning rules and thresholdsThe delivery-slip threshold, signature limits, operational spares, lease notice reminders and planning horizon, versioned and on the audit trail.
Governance

Built for fleet decisions: cited, checked, signed.

Every count and price is citedEach aircraft count, cost line and agent statement links to the passage it came from — the delivery notice, the purchase agreement, the lease, the maintenance forecast, the network plan.
Re-checked blind before anyone sees itThe Checker agent re-counts and re-prices every option from the sources, without the other agents' working. It cannot be turned off for options sent to the committee, and an expired quote lowers an option's confidence.
Decisions signed with a reason codeChoosing an option, rejecting one, dismissing a signal and approving an assumption change are each signed with a reason code — FC-COST, RJ-ASM, SPARES — and stay on the record.
Finance checks, the VP signs, the committee decidesThe Director of Fleet Planning chooses, Fleet Finance checks every cost, the VP Fleet signs and the fleet committee decides. Above $10M an option needs the VP Fleet's signature; above $25M the fleet committee decides, so the $47.0M S-14 goes to the committee.
Agents propose; they never act for youAgents never choose an option, sign, change the approved plan, or contact a lessor or the manufacturer. Systems of record are read-only, and delay compensation is never counted before Legal confirms.
An audit trail that cannot be changedEvery action by a person or an agent is recorded — what, when, on which option, with the reason code — and exports as an evidence pack with the sources attached. Changes to the rules are versioned.
Configuration

Your fleet planning rules, not ours

The thresholds every delivery slip, lease end and option is judged against are settings, versioned and on the audit trail.

SettingDefaultChoose from
Build options automatically when a delivery moves more than60 daysAny number of days; below it, the plan updates and you are told
An option above this fleet cost needs the VP Fleet's signature$10MAny amount, in $M
Above this, the fleet committee decides$25MAny amount, in $M; chaired by the CFO
Operational spares, widebody2 aircraftAny number; shown as the gap to the network plan
Operational spares, narrowbody4 aircraftAny number; shop visits under this are absorbed
Remind lease owners before a notice date90 daysAny number of days, and again 7 days before
Planning horizon2026–20332026–2033 · 2026–2036
The Checker re-computes every option before you see itOnCannot be turned off for options sent to the committee
Connections

Works with the records a fleet plan already runs on

Fleet registerthe maintenance and engineering system: every tail, age, ownership and next heavy check
Order book and purchase agreementsdelivery schedules, the manufacturer's delivery notices and the delay articles
Lease recordslease ends, extension options, notice dates and lessor letters
Network planroutes, frequencies, widebody need and revenue per weekly frequency
Maintenance and engine forecastsheavy checks, engine removals and shop visits
Finance plan and market datafuel price, rents, wet-lease rates and quotes
What it changes

The difference, in numbers.

Every figure is labelled: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
100%
of options priced with rent, maintenance, fuel and revenue at risk, checked blind
3 of 3 priced
before the committee
estimated
$5.4M
lower total effect than absorbing a nine-month 787-10 slip, in the worked case
Absorb the slip$61.8M
Chosen option$56.4M
target
1day
from a manufacturer's notice to checked, priced options, not the next quarterly refresh

“demo” = seen in the working solution, on its sample fleet data · “target” = the design goal, measured in the live solution · “estimated” = our estimate · “typical” = published figures (CAPA, February 2024 — about 53% of the commercial fleet leased; Airbus orders and deliveries — about 9,300 aircraft in backlog, September 2026; IBA forecast via Aviation Week — narrowbody engine shop visits up about 40%, 2024 to 2025). Corvane Airways, its lessors, people, tail numbers and documents named on this page are fictional — characters and sample data in the working solution.

Questions

What fleet planning teams ask about airline fleet planning.

What is airline fleet planning?

Airline fleet planning decides how many aircraft of each type an airline flies in every quarter for the next five to ten years: deliveries from the order book, leases that end or are extended, and old aircraft retired, which makes aircraft retirement planning part of the same count. As airline fleet planning software, Airline Fleet Planning puts that plan on one horizon against the network plan, with seven agents that re-count the fleet after every notice, build and price options route by route and check them blind — the Director of Fleet Planning chooses, finance checks and the VP Fleet signs.

How do airlines plan for an aircraft delivery delay?

When a manufacturer's notice moves deliveries more than the threshold — 60 days by default — the Signal watcher asks for options. The fleet is re-counted quarter by quarter, the delay's impact is shown as the gap to the network plan, and options such as lease extensions, wet leases or absorbing the slip are built, priced and checked, often before the planner arrives.

Should we extend a lease or wet-lease aircraft to cover a delivery slip?

The solution compares both on the same assumptions: fleet cost — rent, heavy maintenance, fuel, wet lease (ACMI) — plus revenue at risk from the routes that cannot be flown. In the sample case extending four 777-200ERs has a total effect of $56.4M against $58.8M for two extensions and two wet leases, because the cheaper option leaves a widebody short all winter. The agents recommend; you choose.

How is the fleet plan checked against the network plan?

The Network coverage agent checks every option route by route and season by season against the network plan — in the sample case eight routes in summer 2027, winter 2027–28 and summer 2028 — and values the frequencies that cannot be flown with the network plan's revenue per weekly frequency. It never changes the network plan; network planning owns it and can protect a route for the next option.

Does it count delay compensation under the purchase agreement?

No, not until Legal confirms it. The agents flag that compensation may be claimable — in the sample case under Article 9.3 for delays over 180 days — and ask Legal Counsel to classify the delay, but no option or paper counts the money before then.

Do people stay in control of fleet decisions?

Yes. Agents build, price and check options; they never choose one, sign, change the approved plan or contact a lessor or manufacturer. The Director of Fleet Planning chooses with a reason code, Fleet Finance checks, the VP Fleet signs and the fleet committee decides, all on an audit trail that cannot be changed.

How long does it take to go live?

The Agentic Solution Engine builds and deploys it from your requirements and documents — your fleet register, order book, leases, network plan and committee format — and it goes live once every quality gate has passed. We will walk you through it on your own fleet first.

See it on
your fleet plan.

We'll run Airline Fleet Planning on your own fleet register, order book, leases and network plan.