Run open RFPs and own every answer until it is signed and submitted
- The answers costing the most points, lit first
- Shipper answers read into the drafts by field
- A package checked against the tender's rules
A 3PL RFP response drafted from past bids with their outcomes, scored by a mock panel on the shipper's own annex, and signed by four people before it is submitted.
See a warehouse bid scored and signed screen by screen ↓A shipper's warehouse tender comes with hundreds of questions, a pricing template, a draft agreement and an annex that weights every section. The bid team rebuilds answers from old bids in a word processor under a deadline, and the weighted sheet the shipper will use stays unopened.
So the weak answers are found by the shipper's panel: an accuracy promise copied from another site, service credits offered with no maximum, a transition plan with weeks and no dates. Finance signs commitments it has never replayed on the sites' own results, for a term of several years.
Built forBid managersSolutions design leadsChief financial officersLegal counsel
Shippers score a warehouse bid on a weighted annex the bid team never scores itself on.
Pieced together for each bid
Built-in controls
The bid team fixes the answers that cost the most points, and finance signs exposure it has already seen.
Bid managers, solutions design leads, counsel and CFOs work a warehouse tender on them. The screens follow one cookware brand's single-site RFP.
demoShipper, provider, sites, people and numbers shown here are sample data.
Each signs a different part of the response, and none signs work they prepared.
Run open RFPs and own every answer until it is signed and submitted
Sign the solution, service levels and transition; approve lessons
Sign the price and each commitment that costs money, as second person
Decide each exception to the shipper's draft agreement
What the first draft carried, and what the shipper's panel would have found instead of the bid team.
Copied by the drafter from an old bid. Sites 7 and 3 averaged 99.85%, and lesson L-04 bars the promise without carton-level audits. Rewritten at 99.80%.
Replayed on last year's site results, the first draft would have cost $405,090.00 in credits. With a 3% cap the same history costs $189,042.00.
Fourteen weeks from award, no cutover, no holiday freeze. Once the shipper published its transfer dates, the plan carried dated waves and a freeze.
The first draft of one question told every bidder about the site's pick modules. Reworded before posting, under lesson L-09.
demoSample data, from the working solution.
What the VP, the CFO and the bid manager open before the response goes in.
demoSample data, from the working solution.
Each hands its work to another agent or to a named person on the bid team.
Splits the questions out with their annex weights and finds the rules that sit outside the questions.
Drafts from past bids with their outcomes, site records and the signed design, and lifts marked-down answers.
Fills the price form from the signed design and adds volume bands from its sensitivity table.
Drafts portal questions by question ID, checks them for design leaks and reads published answers by field.
Plays the shipper's procurement, operations and finance evaluators and scores each answer against the annex.
Replays proposed KPIs and credits on last year's results at comparable sites.
Lists differences between the draft agreement and the company's terms, with the answers each touches.
Checks length and naming rules, builds the package and leaves out privileged material.
A 3PL RFP response is a warehouse provider's answer to a shipper's request for proposal: hundreds of questions, a pricing template, a draft agreement and a scoring annex. Here agents draft each answer from past bids, a mock panel scores them on the shipper's annex, and four people sign before submission.
Against a weighted annex: price, solution design, service levels and risk, technology, transition, team and sustainability, each worth a share of the total. The mock panel scores each answer the same way and labels the result an estimate.
Yes, with their outcome. The drafter shows whether each source bid won or lost and what its debrief said, and a lesson in force stops a promise that has already lost a bid.
No. The price comes from the signed solution design, the solutions engineer sets the rates, and the CFO signs the price and the credit cap as second person. Cost and margin stay inside the company.
Legal counsel, clause by clause, with a written reason that stays privileged. The agents list the differences and the answers each touches, and take no position.
Three designs priced from the shipper’s data, the first contract peak played before anyone signs.
1-min demo3PL Client OnboardingEvery requirement tied to a tested rule before go-live, so the first month is not chargebacks.
1-min demo3PL SLA ManagementOne monthly result both sides can check, each excluded order tied to its record.
1-min demoSend one past RFP, its scoring annex and your answers, and we will score them the way the shipper's panel did.